EE Support TEV Abort Inputs

EE Support TEV Abort Inputs. HOPS (QFA4, QFE1, QFF3, QDD1, QDE2, QDF4, SF, SD, &SQ) Abort = Power Supply OFF DIPOLE CORRECTORS (275 PSs located around ring) Abort = Power Supply OFF C0 SHUNT (T:C0SH) Abort = +/- 0.5 amp or greater regulation error 100 amps maximum

geordi
Download Presentation

EE Support TEV Abort Inputs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EE Support TEV Abort Inputs • HOPS(QFA4, QFE1, QFF3, QDD1, QDE2, QDF4, SF, SD, &SQ) Abort = Power Supply OFF • DIPOLE CORRECTORS(275 PSs located around ring) Abort = Power Supply OFF • C0 SHUNT (T:C0SH) Abort = +/- 0.5 amp or greater regulation error 100 amps maximum 11 amps/sec max. slew rate

  2. EE Support TEV Abort Inputs(Cont.) • LOW BETA QUADS 1 kamp PSs (AQ7, AQ9, AQ0, BQ7, BQ9, BQ0, CQ9, CQ0, DQ7, DQ9, & DQ0) Abort = Power Supply OFF High Current PSs (B0Q1, B0Q2-4, B0Q3, B0Q5, B0Q6, D0Q1, D0Q2-4, D0Q3, D0Q5, D0Q6) Abort = +/- 15 amps or greater regulation error and/or, PS OFF • F17 Kicker Abort = Tripped/OFF

  3. EE Support TEV Abort Inputs(Cont.) • TECAR (1, VME-based uP in A2) TEV Ramp generation and PS Voltage profiles QPM Communications See System logic diagram for ABORT detailed actions Abort Summary: QPM link failures Overcurrent PS Loop

  4. EE Support TEV Abort Inputs(Cont.) • QPMs(24, Power PC uPs, one in every 1-4 building) TEV Magnet Quench Protection Monitors See System logic diagram for detailed abort actions  Abort Summary: TEV Main PSs QUENCHes LEAD Failures Quench Protection System Faults (Dumps, HFUs, QBSs, UPSs) Timing: 3 ms filtering in VFCs 60 Hz sampling of UP/DWN counters 3, line cycle averaging 0.5 volt detection level

  5. QPM/TECAR System Logic Diagram

  6. TEV Ring Schematic

  7. TEV PS/Dump Schematic

  8. TEV Quench Protection Cell - typical

  9. TEV Quench Protection Voltage Meas. Magnet ½ Cell

  10. QPM Quench Growth Rates(Cell Voltage Plots)