1 / 19

FPN 411011-4-52-01 411011-4-56-03 411012-2-52-01 DCN E7I42

FPN 411011-4-52-01 411011-4-56-03 411012-2-52-01 DCN E7I42. UTILITY INFORMATION SHARING. INVOLVED UAOs. AT&T Bright House Networks HUB Non-HUB Hernando County Utilities Teco Peoples Gas Withlacoochee River Electric. Existing Facilities.

Download Presentation

FPN 411011-4-52-01 411011-4-56-03 411012-2-52-01 DCN E7I42

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FPN 411011-4-52-01411011-4-56-03411012-2-52-01DCN E7I42 UTILITY INFORMATION SHARING

  2. INVOLVED UAOs • AT&T • Bright House Networks • HUB • Non-HUB • Hernando County Utilities • Teco Peoples Gas • Withlacoochee River Electric

  3. Existing Facilities • Refer to Advanced Utility Coordination Documentation and Concept Plans • Bright House Network HUB has been fully relocated and property has been vacated.

  4. RFP States: • I. Description of Work • FP ID 411011-4-52-01 • Shall include removal of existing utility infrastructure as described in section VI. C. • AT&T • Bright House (non HUB) • Teco Peoples Gas

  5. RFP States: • I. Description of Work • FP ID 411011-4-56-03 • Includes performance of all of Hernando County’s utility design and construction. • The Hernando County Utility Department (HCUD) Specifications - Water, Reclaimed Water and Wastewater Construction Specifications Manual (January 2013) are provided as an Attachment to the RFP • Hernando County Utility Work Concept Plans are included as a reference document • Coordinate with the Department and with Hernando County for final design approval. • Design Build Firm shall become the Engineer-of-Record for the UWHCA plans, obtain all required permits and also be responsible for signing and sealing utility construction as-built plans in accordance with Hernando County standards.

  6. RFP States: • B. Department Responsibility • The Department will be responsible for paying the Utility Agency/Owners (UAO) for reimbursable relocation costs. This does not include any utility costs associated with relocating or re-building the existing guardhouse building at the LaRose Road entrance to the Withlacoochee State Forest’s Croom Motorcycle Area as described in Section I.

  7. RFP States: • Department Commitments • Hernando County Utility Work • Removal of existing facilities for • AT&T • Bright House • Teco Peoples Gas • Avoidance of utility facilities either existing or adjusted in advance of this project as outlined within the RFP (and described in next few slides).

  8. RFP States: • AT&T – Will relocate in advance of the construction by crossing under mainline I-75 at approximately STA 2048+26 LT to RT and then along the limits of SMF MC. • The remainder of the AT&T’s facilities to be adjusted or relocated will be addressed during construction.

  9. RFP States: • Teco Peoples Gas – Will relocate in advance of the construction by crossing under mainline I-75 at approximately 2042+14 LT to RT (4” PE) along the south side of SR 50 • The remainder of the Teco Peoples Gas facilities to be adjusted or relocated will be addressed during construction.

  10. RFP States: • Bright House Networks – Do not impact the underground existing facilities crossing under mainline I-75 from approximately STA 2047+46 LT to RT (3-2” conduit w/138ct FOC in 2 of 3 conduit) • The remainder of the Bright House Network facilities to be adjusted or relocated will be addressed during construction.

  11. RFP States: • Withlacoochee River Electric Cooperative – Do not impact the underground existing facilities crossing under mainline I-75 from approximately 4027+52 LT to RT (3-4” flex pipe & 1-2” communication line) • The remainder of the Withlacoochee River Electric Cooperative facilities to be adjusted or relocated will be addressed during construction.

  12. RFP States: • Hernando County – Do not impact the underground existing facilities crossing under mainline I-75 as described below at: • South of SR 50 • Sewer: 2035+30 LT to RT • Water: 2035+50 LT to RT • North of SR 50 • Sewer: 2057+44 LT to RT • Water: 2057+34 LT to RT

  13. RFP States: • NOTE: Be sure to read entire section within RFP- • DEVIATION  FROM THE UTILITY RELOCATION PLAN: The Design Build Firm may request to deviate from the Department’s commitments above, however approval from both the Department and the affected UA/O(s) will be required.   • If the Design-Build Firm chooses to deviate from the Department’s commitments and receives approval, the Design-Build Firm shall be solely responsible for all increased costs incurred by the utility owner associated with the impact.

  14. What to include in your bid:411011-4-52-01 • Removal of existing facilities for • AT&T • Bright House • Teco Peoples Gas

  15. What to include in your bid:411011-4-56-03 • Performance of all of Hernando County’s utility work.

  16. FDOT Will Pay UAOs Directly For • All other effort as outlined in the executed or to-be-executed agreements.

  17. Agreements • AT&T - executed • Bright House Networks • HUB - executed • Non-HUB - executed • Hernando County Utilities - executed • Teco Peoples Gas - executed • Withlacoochee River Electric – executed for engineering,pending for construction.

  18. Mandatory Hernando County Meetings with Firms • Directly after this meeting • Granite/Parsons 1:00 – 2:00            • Lane/BCC                    2:00 – 3:00         • Middlesex/Wantman 3:00 – 4:00     • Prince/Stantec       4:00 – 5:00           

  19. Utility Meetings with Firms • MONDAY, September 15 • Brooksville Training Room • Granite/Parsons 9:30 – 10:30            • Lane/BCC                    10:45 – 11:45         • Middlesex/Wantman 1:15 – 2:15     • Prince/Stantec       2:15 – 3:15           

More Related