PROJECT DESCRIPTION • Purpose of Project • Road is a Major Arterial • Realign and Widen Road to Ultimate Configuration • Connect Road to a Proposed Major Arterial Consistent with General Plan • Road Before Project • Center Dual Left Turn Lane • Dead-Ends at a Bank Building South of Project
PROJECT DESCRIPTION • Road After Project • Two Lanes in Each Direction • Landscaped Median • Ability to Connect to Future Major Road • Full Street improvements
PROPERTY DESCRIPTION • Industrial Building • Light Industrial Zoning • Business Park General Plan • Low Building Coverage Ratio • Access From One Driveway • Need for Small Area of Fee and Temporary Construction Easement for Project
IMPACTS TO PROPERTY • Acquired Property and TCE • Landscaping & Internal Circulation Road Impacts • Widen Driveway • New Raised Median – Restrict Left Turns • Travel Distance for Truck from Freeway - Before vs. After Condition
Driveway BeforeNo Raised Median Driveway After Raised Median
Original Truck Route from Freeway3800 Ft ~ ¾ Mile New Truck Routes from Freeway 9500 Ft ~ 1 ¾ Miles 10800 Ft ~ 2 Miles
NEGOTIATIONS WITH OWNER • Attempts to Acquire Property with Owner by Negotiated Agreement • No Success • Council Adopted Resolution of Necessity • Complaint Filed
APPRAISAL VALUATION • Valuation of Larger Parcel – Entire Property • Income Capitalization • Sales Comparison Approach • Valuation of Land Value – As Acquisition Area Included Land and Only Site Improvements • Value of Fee Part Acquired (Land & Site Improvements) • Value of Remainder After Acquisition • Value of Temporary Construction Easement
VALUATION OF THE PART ACQUIRED Land Area$/SF% Rights AcquiredIndicated Value 13,363 SF x $7.50 x 100% $100,223 Value of the Land - Fee Part Acquired $100,223 SITE IMPROVEMENST/COMPONENT SUNITUNIT PRICECOST • Asphalt Paving 5,850 SF $2.50 PSF $14,625 • Total Site Improvements $14,625 • Indirect Costs (13.0% of Direct Costs) $1,901 • Total Direct and Indirect Costs $16,526 • Entrepreneurial Profit (15.0% of Total) $2,479 • Replacement Cost New of Hardscape Improvements $19,005 • Less: Depreciation (50.0%) $ 9,503 • Depreciated Replacement Cost New of Hardscape $ 9,503 • Landscaping: • Grass with Sprinklers 7,513 SF $2.50 PSF $18,783 • Trees 2 $350.00 EA $ 700 • Total Landscaping Costs $19,483 • Indirect Costs (13.0% of Direct Costs) $2,533 • Total Direct and Indirect Costs $22,015 • Entrepreneurial Profit (15.0% of Total) $3,302 • Replacement Costs New of Landscaping $25,318 Estimated Value in Place of the Improvements $34,821
Summary of Part Acquired Valuation Value of the Land to be Acquired in Fee $100,223 Plus: Value of the Improvements to be Acquired 34,821 Total Value of the Fee Part Acquired $135,044 * * * Area Rate Percentage Term Value 9,360 SF x $7.50/SF x 10% x 1.25 Year = $8,775 Value of Land Area in Temporary Construction Easement $8,775 All site improvements within the temporary construction easement area will be replaced in kind as part of the project.
SUMMARY OF VALUE CONCLUSIONS Value of the Whole Before Acquisition $2,780,000 217,804 SF - site (fee) + improvements Value of the Part Acquired as Part of the Whole $135,044 (Fee) 13,363 SF of Land $100,223 Site Improvements $ 34,821 Value of the Remainder as Part of the Whole $2,644,956 Value of the Remainder After Acquisition, Disregarding Benefits $2,644,956 Severance Damages $ -0- Value of the Remainder After Acquisition, Considering Benefits $2,644,956 Less: Benefits $ -0- Net Severance Damages $ -0- Estimated Just Compensation $135,044 Value of Temporary Construction Easement Part Acquired: TCE 9,360 SF of land $ 8,775 Just Compensation for Temporary Construction Easement $ 8,775 Total Estimated Just Compensation $143,819 Rounded To: $145,000
LEGAL PROCESS • Resolution of Necessity • Filing of Complaint in Eminent Domain • Answers Filed by Property Owner and Lessee • Meetings on Site with Property Owner and Lessee • Deposition of Lessee • Mediation to Narrow Issues • Exchange of Expert Valuation Data • Settlement with Lessee • Mediation on Valuation Issues • No Settlement with Owner • Deposition of Experts
DEFENDANT’S APPRAISER’S VALUATION • Value of the Larger Parcel $3,600,000 • Value of Fee Part Acquired $ 286,240 • Land Value 13,363 SF @ $13.55/SF $181,100 • Improvements in Fee Area: • Three Mature Trees $50,000 • Grass & Sprinkler System $41,535 • Chain Link Fencing w/Barb Wire $ 1,875 • Asphalt Paving $11,730 • Total Improvements $105,140 • Temporary Construction Easement - 0- • Cost to Cure Damages (15% of $3,600,000) $ 540,000 • Severance Damages (20% of $3,600,000) $ 720,000 • Total Just Compensation $1,546,140
DEPOSITION OF EXPERTS • Appraisal – Weakness in Property Owner’s Appraisal • Errors Found • Methodology Problems • Architect • Appraiser – 2nd Day Follow Up Questions • Traffic Engineer • Weakness in Analysis • Different Scale Used for Drawings • Truck Turning Radius Different than Scale Used for Underlying Architectural Site Drawings
Truck Path Turning In Truck Path Turning Out
FURTHER SETTLEMENT TALKS • After Depositions • Identified Strengths and Weaknesses of Case • Prepared Motions • Consideration of Trial Costs • Legal • Expert Fees • Exhibits • Stronger Negotiating Position After Depositions • Owner Settled for Less Than Original Offer
WRAP UP • Owner’s Purpose in Challenging Acquisition – Rezone Property Light Industrial vs. Service Commercial