170 likes | 268 Views
Olin Library Reference Statistics Reporting System. CS 501 Team: Ronald DeVera Matthew E Kulick Annie Lin Kavitha Nair Soutrik Pramanik Krystal Wang Kevin Wong. Preview. Purpose:. Relate our visible progress. How:. Requirements Document Prototype (and design). Presentation Overview.
E N D
Olin Library Reference Statistics Reporting System CS 501 Team: Ronald DeVera Matthew E Kulick Annie Lin Kavitha Nair Soutrik Pramanik Krystal Wang Kevin Wong
Preview Purpose: Relate our visible progress How: • Requirements Document • Prototype (and design)
Presentation Overview What we’ve done Feasibility Report, Mock-up, Preliminary Requirements, Prototype Recap of requirements analysis, Defn. of first milestone Where we are (Updated) Schedule Progress, 2nd Phase/2nd Iteration, Discuss schedule progress, project milestones What we’re doing Introduce Prototype, walk through, discuss prototype’s role in milestone
Presentation Overview (2) Why we’re doing it Introduce use cases Mention scenarios Where we’re going Relate future milestones Brief on 2nd Iteration processes (design, user testing ,etc)
Accomplishments thus far: • Feasibility Report • Mock-Up • Preliminary Requirements • Prototype
Requirements for 2nd Iteration • Login Page • Basic Data Entry • Simple Confirmation • Search Form • Admin Page
Login & Data Entry • Login needs a robust system that can add additional user types • Drop Down Menus • Data Entry form on one page
Search & Admin • Basic search capabilities • Admin page will outline basic admin functionality
Overview of Progress • On track for 2nd Iteration
Future Tasks • User testing (design and functionality) • More robust functionality • Error handling
Phase 3 2nd Iteration and System Design