Report to OC March 25/26, 2014 Salt Lake City

Vern Kissner [TPWR] Chair – Critical Infrastructure and Information Management Subcommittee (CIIMS). Report to OC March 25/26, 2014 Salt Lake City. CIIMS. Workgroups DEWG – Data Exchange [ Stacen Tyskiewicz – BPA ] EMSWG – Energy Management System [ Jon Aust– WAPA ]

gerard
Download Presentation

Report to OC March 25/26, 2014 Salt Lake City

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Vern Kissner [TPWR]Chair – Critical Infrastructure and Information Management Subcommittee (CIIMS) Report to OC March 25/26, 2014 Salt Lake City

  2. CIIMS • Workgroups • DEWG – Data Exchange [Stacen Tyskiewicz – BPA] • EMSWG – Energy Management System [Jon Aust– WAPA] • PSWG – Physical Security [Jay Spradling - SRP]

  3. DEWG – Data Exchange • Last meeting – Feb 2014 • Next meeting – June 2014 • WON Responsibilities Procedures Guideline • Currently considering and may incorporate NERC feedback comments. • WON security guideline • Revisions are being considered for a 2014 updated version. • The WON security guideline / Connection criteria (appendix) will be distributed to all TOP / BA member representatives for signatures. • Secure ICCP • Pacific National Laboratory has been granted access to the WON to test secure ICCP and develop a implementation plan.

  4. EMSWG - Energy Management System • Last meeting – February 2014 • Next meeting – June 2014 • Survey questionnaire • Support staffing • Training • Real-Time Tools Guideline • Document is currently being updated to incorporate some of the NERC feedback comments. • A section on the exchange of manually entered switch is also being added in the revision. • The updated document will be on the March 2014 OC agenda for approval.

  5. PSWG – Physical Security • Last meeting – February 2014 • Next meeting – Aug 2014 • Incorporating Security into Substation Design • NERC Project 2014-04 Physical Security Standard Drafting Team Effort

  6. WECC Loss of SCADA Event Report Effort 2b and 1h

  7. 1h – Partial loss of EMS that significantly effects operation… • 2013 – Quantity = 5 • 2014 – Quantity = 4 • 60% / 40% – Infrastructure related / EMS related.

  8. 2b – Complete loss of EMS… • 2013 Q4 – Quantity = 3 • 2014 Q1 – Quantity = 2

  9. 2b trend

  10. questions