P19093: Hospital Bedside Table Build & Test Prep Review. Tuesday, 2/05/19. Agenda. Recap Previous Phase To-Do Items Customer Requirements Base Design Testing Plans Caster Configuration Caster Maneuverability Tabletop Breakability Bill of Materials (BOM) Risk Assessment
E N D
P19093: Hospital Bedside Table Build & Test Prep Review Tuesday, 2/05/19
Agenda • Recap • Previous Phase To-Do Items • Customer Requirements • Base Design • Testing Plans • Caster Configuration • Caster Maneuverability • Tabletop Breakability • Bill of Materials (BOM) • Risk Assessment • Project Timeline • Next Steps • Questions
Recap Goals ✓ Agreement on final base shape ✓ Start building test prototype and complete test plans ✓ Research table top finishes • Update testing progress • Review caster selection • Verify progress moving in the correct direction
Recap Customer Requirements MSD group’s focus is on redesigning base.
Recap Base Design This is the final base design shape.
Testing Plans • Ease of Maneuverability • Base Design - ✓ • Caster Configuration - ✓ • Caster Maneuverability - ✓ • Tabletop Loads • Tabletop Breakability - ✓ • Tipibility - o • Durability - o • Base Disinfection Test • Caster Cleanability - ✓ • Base Cleanability - o • Finish Durability - o • Human Simulation • Patient Simulation - o • Caretaker Simulation - o Links to individual test plans can be found here: http://edge.rit.edu/edge/P19093/public/Build%20%26%20Test%20Prep
Testing Plans - Caster Configuration Result: Round Casters
Testing Plans - Tabletop Breakability Bending determined by gap Scale acts as varying point loads
Testing Plans - Tabletop Breakability Result: Use 4 planks. (Note: Wood-glued poplar planks increased strength and reduced bending)
Project Timeline Overview August - December 2018 ✓ Problem Definition Phase • September 16th, 1:30pm at RIT ✓ Systems Design Phase • October 16th, 12-1pm at RGH ✓ Preliminary Detailed Design Phase • November 13th, 12-1pm at RGH ✓ Detailed Design Phase • December 4th, 12-1pm at RGH January - April 2019 O Build & Test Preparation Phase • February 5th, 11:30am at RGH O Subsystem Build & Test Phase • February 19th, 12-1pm at RGH O Integrated System Build & Test Phase • March 28th, 12-1pm at RIT O Customer Handoff & Final Project Phase • April 18th, 12-1pm at RGH
Next Steps • Subsystem Build & Test phase begins 2/7/2019 • Complete test plans • Base Durability • Finish Durability • Start test plans • Tipibility • Durability • Start assembling all desired parts for building Link to EDGE: http://edge.rit.edu/edge/P19093/public/Home