1 / 5

UCLA IEP/RHI Group (Huan Z. Huang, G. Igo, S.Trentalange, O.Tsai) R&D for SciFi calorimeters

UCLA IEP/RHI Group (Huan Z. Huang, G. Igo, S.Trentalange, O.Tsai) R&D for SciFi calorimeters STAR forward upgrades. Transformation STAR->eSTAR. Dedicated EIC detector. New, simple, cost effective, flexible technique to build compact sampling calorimeters.

gerodi
Download Presentation

UCLA IEP/RHI Group (Huan Z. Huang, G. Igo, S.Trentalange, O.Tsai) R&D for SciFi calorimeters

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UCLA IEP/RHI Group (Huan Z. Huang, G. Igo, S.Trentalange, O.Tsai) R&D for SciFi calorimeters STAR forward upgrades. Transformation STAR->eSTAR. Dedicated EIC detector. New, simple, cost effective, flexible technique to build compact sampling calorimeters. Need to be proven. Need for a test run.

  2. Example. Possible evolution of calorimeters in STAR. Forward direction (West side). Should consider: Available space Magnetic Field Radiation Installation/Integration

  3. INTERACTION POINT (June 20,2003) “Cooperative Spirit of SLAC Pays Off for UCLA Researchers.” Test Run T466. In 2003 we tested small EMC prototype at SLAC. We refined construction technique in 2004, and was scheduled for a test run at SLAC in the fall of 2004. Unfortunately after test run was postponed we were not able to continue R&D in this direction at that time. This method of building ScFi calorimeters has yet to be prooven! SLAC Test Beam Facility is very important for calorimetry R&Ds!

  4. As a proof of principle we want to build 4 x 4 EMC prototype using new technique we call it “spacardeon”. If funds will be available we will try to Investigate possibility of building SPACAL type Hcal using W powder/ScFI.

  5. Parameters required for Beam Tests To the presenter at the ESTB 2011 Workshop: please, fill in the table (at best) with the important parameters needed for your tests

More Related