SWARNAMUKHI BARRAGE. Barrage-cum-Bridge. L/S Canal system 10.50 km. Tupili Tank. LEFT MAIN CANAL. SWARNAMUKHI RIVER. BARRAGE. SUPPLY CHANEL TO TUPILI TANK. EPC Package Works under progress. R/S Canal System 2.50 Km. System Tanks. System Tanks. Supply Channel 3.35 Km.
E N D
SWARNAMUKHI BARRAGE Barrage-cum-Bridge L/S Canal system 10.50 km Tupili Tank LEFT MAIN CANAL SWARNAMUKHI RIVER BARRAGE SUPPLY CHANEL TO TUPILI TANK EPC Package Works under progress R/S Canal System 2.50 Km System Tanks System Tanks Supply Channel 3.35 Km Project cost : 52.04 Cr Ayacut : 11500 ac
SWARNAMUKHI BARRAGE Pkg.No. 6/ Cat-II : Construction of Barrage-cum-bridge across Swarna Mukhi River. Name of the Contractor : M/s. R.M.N-G.V.R (J.V) Agreement Amount : Rs. 41.46 Crs. Agreement Date : 09-03-2005 Period of completion : 24 Months (8 milestones) Target date of completion : 2/2007 • Investigation : 3.35 Km length against 11.00 Km (appr.) • Designs : 3.35 km length against 11.00 Km • Execution : 0.50 Km length against 3.35 Km (Lining) • Qty. of earth work done : 35,000 cum against 60,000 cum • Qty. of concrete work done : 2000 cum against 40,000 cum. • Machinery : deployed 31Nos (Dozers 1 No., VEC -1,Tippers-20, Mixters-6) • Expenditure :2004-2005 - Rs. 2.07 Crs 2005-2006 - Rs. 15.82 Crs. • Cum. Exp. Inc.Mob. Adv. - Rs. 17.89 Crs. • Land Acquisition : Required 6.54 Ac, Acquired under progress