STAGE DE 2 EME ANNEE. Maintenance industielle Thomas YYY BTS 200X-200X. Photo de l’entreprise XXX. SNC XXX Route de Marc 38269 BAIRE. Lycée L’oiselet 38300 Bourgoin Jallieu. EMBALLAGE : LIEU D’ETUDE. Carton plein de pions. Lingot.

gianna
Download Presentation

Maintenance industielle Thomas YYY BTS 200X-200X

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STAGE DE 2 EME ANNEE Maintenance industielle Thomas YYY BTS200X-200X Photo de l’entreprise XXX SNC XXX Route de Marc 38269 BAIRE Lycée L’oiselet 38300 Bourgoin Jallieu

  2. EMBALLAGE : LIEU D’ETUDE Carton plein de pions Lingot Aluminium liquide Bobine de bande aluminium PROCEDE DE FABRICATION pion

  3. CAHIER DES CHARGES FICHE SIGNé

  4. POURQUOI UNE MAINTENANCE PREVENTIVE? LA LIGNE E01 EST UNE MACHINE CAPITAL POUR L’ENTREPRISE ? NON LA LIGNE E01 ET E04 EST TRES SOUVENT EN PANNE ? NON LA POLITIQUE DE L’ENTREPRISE EST D’ETABLIR UNE MAINTENANCE PREVENTIVE ? OUI

  5. CAHIER DES CHARGES • SITUATION INITIAL • MOYEN • OBJECTIF

  6. La ligne d’emballage E01 et traitement de suface E04 C3 Skip Légende C4 Barrate C2 Chemin cartons + pions UN Scotcheuse + Fermeuse 1 Bascule Chemin pions Vibreur C1 Tapis secondaire UN= Unité de marquage 2 C5 C…= Convoyeur Formage Préhenseur Palette C6

  7. Comment procéder ? Logiciel de GMAO Syntèse des cout par sous ensemble Logiciel de GMAO Syntèse des coût par panne Documents constructueus et personnel Trouver des solutions Réalisation des fiches

  8. Annalyse de l’Historique La ligne d ‘emballageE01 fermeuse bascule formeuse

  9. SYTHESE PAR PANNE SUR LA FORMEUSE E0110

  10. formage Collage Pannes Fuite flexible ou de vérin, Mauvaise pression Environnement sale E0110 Fuite de colle Mauvaise fonte Tuyau et buse bouchés

  11. Solutions proposées Fuite pneumatique Contrôle (à chaque début équipe) Mauvaise pression Petit nettoyage(début équipe) Grand nettoyage (hebdomadaire) Environnement sale Nettoyage ,verrification des tuyaux et du pistolet (hebdomadaire) Fuite de colle Mauvaise fonte Tuyau et buse bouchée Purger entierement le fondoire et le circuit de collage (hebdomadaire)

  12. DISPO MACHINE A L’ARRET TPS INTERVENTION // // DOCUMENTATION TECHNIQUE DOC QE 63_12 Gamme de maintenance Préventive version C date de mise à jour :03/05/2001 NATURE // // D - DOSSIER DE MAIMTENANCE D4 - MAINTENANCE PREVENTIVE D41 _ Gamme de Maintenance Préventive CODE MACHINE E01 DATE INTERVENTION // // N° NEW MAINT MACHINE Petit carton DATE BOUTOIR // // SOUS-ENSEMBLE DISPO MACHINE A L’ARRET PERIODICITE Mensuel TPS INTERVENTION // // URGENCE U1 NATURE // // PREPARATION DE L’EQUIPEMENT DESCRIPTION DES OPERATIONS VISITE OSERVATION BON FAIT Lecture • Pour tout contrôle des convoyeurs s’assurer que la ligne soit isolée des énergies pneumatiques et électriques CONVOYEUR POSTE DOSAGE • Contrôle du sous ensemble d’entrainement, absense de fuite du réducteur, états des pignons tensions des chaines QUALIFICATION INTERVENANT TEMPS PASSE OBSERVATION ELECTROMECANITIEN H MECANITIEN H H DOCUMENTATION TECHNIQUE DOC QE 63_12 Gamme de maintenance Préventive version C date de mise à jour :03/05/2001 D - DOSSIER DE MAIMTENANCE D4 - MAINTENANCE PREVENTIVE D41 _ Gamme de Maintenance Préventive Fiche préventive CODE MACHINE E01 DATE INTERVENTION // // N° NEW MAINT MACHINE Petit carton DATE BOUTOIR // // SOUS-ENSEMBLE PERIODICITE Mensuel URGENCE U1 PREPARATION DE L’EQUIPEMENT

  13. Coût de la maintenance Coût total des pièces =1369.50€ Coût total de la main d’œuvre=2146.50€ Coût total des contrat=1410€ Coût total de la maintenance =4768€