Amphibious Construction Battalion Two. The Final Link in the Sealift Chain. Maritime Prepositioning Force. Joint Logistics Over The Shore (JLOTS). BENIGN. CMPF. Chain of Command. CINCLANTFLT. COMNAVSURFLANT. COMPHIBGRUTWO. COMNAVBCHGRUTWO. ACB-2. BMU-2. ACU-2. ACU-4. Mission Areas.
E N D
Amphibious Construction Battalion Two The Final Link in the Sealift Chain
Maritime Prepositioning Force Joint Logistics Over The Shore (JLOTS)
Chain of Command CINCLANTFLT COMNAVSURFLANT COMPHIBGRUTWO COMNAVBCHGRUTWO ACB-2 BMU-2 ACU-2 ACU-4
Mission Areas • Causeway Ferry • Roll On/Roll Off Discharge Facility (RRDF) • Amphibious Assault Bulk Fuel/Water System (AABFS/AABWS) • Offshore Petroleum Discharge System (OPDS) • Elevated Causeway, Modular (ELCAS-M) • Defensive Military Operations • Camp Support
Side Loadable Warping Tug (SLWT) Causeway Section Powered (CSP) Causeway Section Non-Powered (CNSP) Barge Ferry System
4 SLWTs 16 CSPs 14 Intermediates 16 Beach Ends 8 LCM-8s MPS-1 Lighterage • For Dynamic Mix: Instream: 8 rolling stock/hour Pierside: 20/hour.
Amphibious Assault BulkFuel/Water System • 5,000 ft of 6” conduit (Fuel) • 10,000 ft of 4” conduit (Water) • Deploy from Barge Ferry or LCU • Install in 8 hours • 700Kgal/day
Offshore Petroleum Discharge System (OPDS) • Single Product 4 NM • Dual Product 2 NM • 1.2 Mgal/day • First Fuel in 48 hrs. • Total install in 7 days • Water Depth 35-200 ft. • Service Life 2 yrs.
Lighterage support w/ OPDS • SLWT Lighterage support: • 3 tow tugs • Converted lay repair barge 1 SLWT • Dive boat - LCM 8 • OUB Lighterage support: • 3 tow tugs - OUBs • Converted lay repair barge 1 OUB • Dive boat - OUB
Elevated Causeway-Modular - Up to 3000 ft length - 20 FSW at MLW - 7 Days to Erect - UCT Site Survey
Berthing Tents Galley/Scullery Laundry Showers/Heads Transportation Beach Salvage Water Purification Medical/Admin Camp Support