2. HEÄ THOÁNG CAÙC NHAØ MAÙY XÖÛ LYÙ NÖÔÙC Dawaco has 4 WTP with total designed capacity 210,000 m3/day
3. MAÏNG LÖÔÙI CAÁP NÖÔÙC THAØNH PHOÁ • Status: Current Total length of 4.124 km, including: • 274 km pipes of grade I (Ø > 200 mm) • 271 km pipes of grade II (Ø = 100 ÷ 200mm) • 3.5479 km pipes of grade III (Ø < 100 mm) in which: 1.243 km service pipes • 202.813 connection (water meter). • Water pressure: • At WTP: 2 – 3,15 bar (equivalent to 20 – 31,5m meters water column). • At distribution network: 1 – 1,7 bar (equivalent to 10 – 17m meters water column). • Water quality: The water supply quality into the network reach "national technical regulations on drinking water quality" of the Ministry of Health following Circular No. 04/2009/TT-BYT
4. ÑÒNH HÖÔÙNG PHAÙT TRIEÅN Để phục vụ nhu cầu gia tăng trong giai đoạn 2013-2018 • Constructing new water treatment plant with the capacity of 120.000 m3/day using water of Cu De river at Hoa Lien commune , Danang city • Installing about 150 km clean water pipeline D<200 –D1000 • Replacing about 40km poor quality pipelines
5. TÆ LEÄ HOÄ DAÂN SÖÛ DUÏNG NÖÔÙC SAÏCH TREÂN ÑÒA BAØN THAØNH PHOÁ • Average water consumption: 132 l/person/day. • NRW rate: 18,14%.
7. TÌNH HÌNH HIEÄN TRAÏNG CAÁP NÖÔÙC HOØA VANG CURRENT POPULATION VÀ POPULATION ESTIMATES OF WATER SUPPLY AREA
7. TÌNH HÌNH HIEÄN TRAÏNG CAÁP NÖÔÙC HOØA VANG NUMBER OF HOUSEHOLDS USING WATER OF HOA VANG DISTRICT (UP TO NOVEMBER 2012)
7. TÌNH HÌNH HIEÄN TRAÏNG CAÁP NÖÔÙC HOØA VANG NUMBER OF PEOPLE USING WATER IN HOA VANG DISTRICT (UP TO NOVEMBER 2012)
6. TÌNH HÌNH HIEÄN TRAÏNG CAÁP NÖÔÙC HOØA VANG Water distribution planning projects on Hoa vang district Term 2013 - 2016
8. PHÖÔNG AÙN CAÁP NÖÔÙC CHO HUYEÄN HOØA VANG CÁC DỰ ÁN QUY HOẠCH CẤP NƯỚC TRÊN ĐỊA BÀN HUYỆN HÒA VANG GIAI ĐOẠN 2016-2020
8. PHÖÔNG AÙN CAÁP NÖÔÙC CHO HUYEÄN HOØA VANG INVESTMENT COSTS CAPITAL