Smart Civil Infrastructure Monitoring. Project Client/Facility Advisor: Randall Geiger Project Team : Team Leader: Xianbo Tao Website Leader: Kun Zhang Communicator: Guoyan Kai. Project Plan. Problem Statement

ginata
Download Presentation

Smart Civil Infrastructure Monitoring

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Smart Civil Infrastructure Monitoring Project Client/Facility Advisor: Randall Geiger Project Team:Team Leader: Xianbo Tao Website Leader: Kun Zhang Communicator: GuoyanKai

  2. Project Plan • Problem Statement • Conceptual Sketch              • Functional Requirements         • Non-functional Requirements • Technical Constraints • Potential Risks              • Resource and Cost Estimate              • Project Milestones & Schedule

  3. Problem Statement • Long-term safety of the aging civil infrastructure • Bridge, Building, Public Transportation, and public utility system. • New concept: Soft capacitor • Powering the monitoring system by using harvesting energy • Code setup for Arduino Board • Wireless communication interface problem

  4. Project Goal • Design circuit for small changes in capacitors • Analyze system reliability • Transfer the signal wirelessly • Test the system stability to environment

  5. Conceptual Sketch

  6. Functional Requirements • Circuit design requirement • Microcontroller wirelessly to computer • MATLAB code to plot sensor output • Environment Resistance

  7. Non-functional Requirements • Limited access to the base station (PC) • Low power dissipation • The communication system free of interference

  8. Technical Constrain • Power consumption • The output voltage limited to saturated voltage of op-amp • Constrain the bandwidth of the Op-amp to enhance the gain of the circuit.

  9. Potential Risks • Capacitance changes so small • Soft-capacitor is unstable • Stress is over the limitation • Temperature • Not completely hooked up on bridge

  10. Resource and Cost Estimate

  11. Project Schedule

  12. System Design • Functional Decomposition • Detailed Design      • HW/SW/Technology Platform used • Test Plan             • Prototype Implementations • Block implementations

  13. Functional Decomposition • Overall Function A monitoring system to inspect potential problems of bridges. • Sub-functions • Measure small capacitance change • Transmit sensor output • Reliable Network • Base station

  14. Detailed Design • System Architecture • The Design Circuit • The Testing Results • Transmit the Signal into Micro-Controller • Transmit the Signal to the Computer

  15. System Architecture

  16. The Design Circuit

  17. The Testing Results • If there is no crack happen on the bridge • Increasing the Delta C

  18. The Testing Results • If the crack happens on the position of C1 • Keep increasing Delta C

  19. The Testing Results

  20. The Testing Results

  21. Transmit the Signal into Micro-Controller

  22. Transmit the Signal to computer • Transceiver to computer. • Notice the maintainers to repair it if problem exists.

  23. HW/SW/Technology Platform • Hardware • Arduino Board • Wishield Board • Soft capacitor • Wireless Router • Computer

  24. HW/SW/Technology Platform • Software • MATLAB • C Language • Arduino software

  25. Test Plan • Small capacitance change • Output voltage based on the delta C • Stability of changing small capacitance • Certainty of Microcontroller system • Communication system • Wishield Board • Computer

  26. Prototype Implementation

  27. Conclusion • Current Project Status • Task Contribution • Plan Rest of This Semester

  28. Current Project Status • Finish the circuit design • Finish the simulation of circuit design • In progress of Microcontroller part

  29. Task Contribution

  30. Plan Rest of This Semester • To fulfill the microcontroller coding • To fulfill the network with computer • Work on the software of interface on computer