EE5900 Advanced Embedded System For Smart Infrastructure
EE5900 Advanced Embedded System For Smart Infrastructure. Static Scheduling. Time Frame. Given a set of tasks, let H denote the smallest hyper period of all tasks. T1=(1,4), T2=(1.8,5), T3=(1,20), T4=(2,20) H=20 Divide time into frames and frame size f should divide H.
490 views • 39 slides