1 / 6

Workaround Idea for PRR 373 --- OOME as Instructed Deviation 11-21-03 WMS Meeting

Workaround Idea for PRR 373 --- OOME as Instructed Deviation 11-21-03 WMS Meeting. Idea from QSE PM meeting. QSE’s that get unit specific OOME instructions can request a Verbal Dispatch Exception (VDE).

ginata
Download Presentation

Workaround Idea for PRR 373 --- OOME as Instructed Deviation 11-21-03 WMS Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Workaround Idea for PRR 373 --- OOME as Instructed Deviation 11-21-03 WMS Meeting

  2. Idea from QSE PM meeting • QSE’s that get unit specific OOME instructions can request a Verbal Dispatch Exception (VDE). • The VDE is a note to ERCOT Settlements that the OOME instruction should be treated as an instructed deviation for settlement purposes (URC calculation).

  3. Idea from QSE PM Meeting • A VDE can only be requested due to a unit specific OOME instruction and must be requested when the instruction is received. • The ERCOT operator approves the request and passes the information to Settlements. • The amount of the VDE is the amount that the zidup or ziddn shall be adjusted in the Settlement System. A VDE is not the same as a Zonal OOM Instruction.

  4. Settlements shall calculate the amount of the VDE based on the RP and IOL passed to Settlements from the MOS.

  5. A detailed description of the manual workaround and the effective start date shall be provided to the market through a Market Bulletin. (Pending final approval by ERCOT Legal.) • If ERCOT at any time determines that the manual workaround is “inappropriate to perform” --- the workaround can be suspended through a Market Bulletin.

  6. Discussion/Questions

More Related