Makeshift Surfaces. Main Street - Re-Profiling Of Travel Surface. Insufficient Funds For Full Overlay. Deep Problems. Wilbraham Rd. Catch Basin About 25 Feet Deep. Wilbraham Road. Built in the mid-1970s Life Expectancy of the pipes is about 25 years.
E N D
Main Street - Re-Profiling Of Travel Surface. Insufficient Funds For Full Overlay
Wilbraham Road • Built in the mid-1970s • Life Expectancy of the pipes is about 25 years.
The Same Vintage Underground Pipe Failed On The Golf Course Last Fall And The Fairway Was Replaced By the Golf Course With This New Water Hazard
Small Bridges Not Part Of The Plan, But Pose Significant Additional Expenses
Hampden’s Previous Paving Plan • $110,000 per Year for Paving Only • Annual Capital Exclusion Override • Passed FY-1997, FY-1998, FY1999 • Failed FYY-2000, FY-2001, FY-2002 • Abandoned FY-2003
Declining Funds Due To Years Of Level Funding • FY - 1996 • Year #1 of 6-year paving plan $110,800 • State Aid (Chapter 90) $198,233 • Available Local Funds (Highway Maintenance) $ 16,000 • Total: $325,033
Compared To This Year • FY - 2006 • Unfunded 6-year paving plan $ 0 • State Aid (Chapter 90) $157,946 • Available Local Funds (Highway Maintenance) $ 14,000 • Total $171,946
10-Year Net Reduction of Available Funds • FY - 1996 $325,033 • FY – 2006 $171,946 • Net Reduction($153,087)
Backhoe Rental • $75 / Hr. • Includes Operator, Thus Available Highway Personnel Cannot Be Efficiently Used. • Must Be Scheduled In Advance.
Possible Backhoe Purchase • If the cost of renting a backhoe for these projects is greater than the cost of purchasing one… • Then the purchase of a backhoe will be considered as part of this infrastructure improvement plan.
Infrastructure Improvement Proposal • $4 Million, 10-Year Bond to “Catch Up” • $300,000 Annual Funding to “Keep Up”