1 / 16

MA05 Overview

MA05 Overview. A. Zacchei on behalf of MA05 INAF-OATs Workshop. MA5 @ OATs ~ ATG. “ MA5” at OATs basically corresponds to a group (the Astrophysical Technologies Group – ATG) having a 35+ years history (and evolution) ATG composition: 34 (11 permanent) from Sept 2013

gino
Download Presentation

MA05 Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MA05 Overview A. Zacchei on behalf of MA05 INAF-OATs Workshop

  2. MA5 @ OATs ~ ATG • “MA5” at OATs basically corresponds to a group (the Astrophysical Technologies Group – ATG) having a 35+ years history (and evolution) • ATG composition: 34 (11 permanent) from Sept 2013 • ATG deals with a continuum of activities covering from telescope/instrumentation control to data archiving through data handling, management, processing, storage and retrieval (e.g. VO); infrastr. • Direct involvement in projects at the national and (especially) international level • Projects mean resources for OATs:funds (6-8 M€), infrastructure (OATs LAN, Lightnet, 96-core “IGI” cluster)

  3. Additional information • ATG supported INAF-SI, the INAF Information Systems Unit (2004-11) with ~1.5M€/yr budget • ATG will support the INAF Unita’ Organizzativa della direzione Scientifica-ICT (funding TBD) • ATG represents INAF in national IT organisations and Italy in international IT organisations at both the technical and «political» levels • ATG is active in the provision/update/support of IT infrastructure for OATs (e.g. Lightnet, SSI)

  4. Talks organization • MA05 can be divided in four main area, three has been selected to be presented at this workshop with the most representative projects performed during 2012: • Ground Based telescope • V. Baldini: Espresso@FDR  Control electronics • G. Cupani: Espresso@FDR  data Analysis Software • Space based projects • D. Tavagnacco  Planck 2013 results • Archive and VO: • C. Knapic: Archive System: IA2 status and international perspective • M. Molinaro: VO: status and new evolutions. • HPC and HTC (GRID) • BUT those are NOT the only projects in which MA05 is involved (as usual we are overcommitted …).

  5. Ground Based Telescope ESPRESSO: Fiber-fed, cross-dispersed echelle spectrograph which can be operated with one or up to 4 Unit Telescopes of ESO’s Very Large Telescope. Co-PI: Stefano Cristiani --> 150K 2014 – 100K 2015 WPs leaded by INAF-OATs: • Software system engineer (P. Di Marcantonio) • Instrument control software (P. Di Marcantonio) • Observation software (R. Cirami) • Data analysis software (V. D’Odorico) • Final design completed • DA Library (DAL) development • Nine partial releases are foresee before May 2015 (gradually implementing all the recipes) • Four releases between the Provisional Acceptance Europe and the Provisional Acceptance Chile are foresee. • Obviously releases will contain an updated version of the DAL design document and DAL validation and test document. Other INAF-OATs people: M. Mannetta, V. Baldini, P. Santin, G. Cupani, S. Galeotta, S. Cristiani.

  6. Ground Based Telescope • BATMAN @ TNG: Digital Micromirror Devices (DMD) based multi-slit optical breadboard spectrograph. Development of control software and electronics at INAF-OATs. To be installed at TNG at the end of 2013.Tecno-PRIN INAF (budget 65 K€) in collaboration with LAM (Marsiglia). • EST (European Solar Telescope), joined in the SOLARNET FP7 project, waiting for funding. • E-ELT: “Progetto Premiale T-rex” (HIRES). • SVAS (le stelle vanno a scuola):Automation of the C14 telescope@basovizza, founds: 3k + 15k (from MIUR)

  7. Space based projects Euclid – activities - funding • Project Office for the SGS: F.Pasian, A.Gregorio, O.Mansutti, C.Vuerli • SGS System Team:M.Frailis, C. Vuerli + new ASI contract • SDC-IT: A.Zacchei, M.Frailis + new ASI contract + eventually (post-2015), staff currently full-time on Planck: M.Maris, D.Tavagnacco, G.Maggio, Thomas Vassallo --- • SGS OU-LE3: S. Borgani, A. Biviano, M. Nonino, M. Viel et al. + new ASI contract • SWGs: • Galaxy clustering SWG: S. Borgani, P. Monaco, M. Viel • Clusters of galaxies SWG: A. Biviano, S. Borgani, O. Cucciati, G. De Lucia, M. Girardi, M. Nonino • Galaxy evolution: O. Cucciati, G. De Lucia, P. Monaco • Cosmological simulations SWG: S. Borgani, G.De Lucia, P. Monaco, G. Murante, M. Viel --- Founding • ItalianfundingforEuclidcomesfrom: • INAF and Universities (salariesofpermanent staff) and ASI • ASI fundsallocatedforItalianinstitutes are 3.3 M€ in 3 yrs (Aug 2012 – Aug 2015): • SGS willreceive~ 1058 K€ • INAF-OATswillreceive~ 495 K€ (249 K€alreadyreceived)= 8.5 FTE (AdR)+ travel (limited)

  8. Space based projects Planck LFI DPC • LFI-DPC, A. Zacchei, A. Gregorio, M. Frailis, M. Maris, S. Galeotta, D. Tavagnacco (PhD), G. Maggio (Borsa), T. Vassallo (Borsa). • We are still in operations that will continue till October 2013. • First public delivery take place in March 2013 (Tavagnacco will summarize the results), next public delivery is expected in middle 2013 (polarization + 8 surveys …). Updated delivery is in discussion (middle 2015). • Current planck founds dedicated to the LFI DPC (INAF-OATs) are covered by “LFI FaseE2 Missione Scientifica e analisi Dati” contract. and its extension (till April 2014) current contract provided to the DPC 670k euro. • We are discussing with ASI a new contract that will covers the DPC needs till the end of 2015.

  9. LSPE – Large Scale Polarization Explorer • Analysis of polarized emission in the microwaves over large sky regions on angular scales of 1°-10°band channel • Detection of B modes of cosmological origin • SWIPE (Short Wavelength Instrument for the Polarization Explorer) and STRIP(STRatospheric Italian Polarimeter) • STRIP: • Q band channel 40 GHz • W band channel 90 GHz • Duties & Responsibilities • INAF-OATs WP 4720: Data Acquisition and Storage (A. Zacchei) WP 4730: Quick Look Analysis (A. Zacchei) • Dep. Physics Univ. Trieste WP 4710: On board Software (A. Gregorio) • Funds: 70 K • Launch End 2014 (TBC)

  10. Customizable Instrument WorkStation (CIWS) • Bando TECNO-INAF 2010 • A reusable software system for processing, quick-look analysis and archiving of raw data acquired from telescopes and auxiliary data sources • OATs: responsible of the Data Access Subsystem (DAS) Lead by M. Frailis • The DAS system provides: • a Data Definition Language in XML (formalized in the XML Schema language) • automatic mapping of the user defined types (in the DDL) to the database schema (support for several DBMSs) • a C/C++ and Python API to store, query and retrieve the data • A post-degree fellowship started on mid-January 2013 (S. Sartori) • This work is strictly related with LSPE.

  11. Unita’ Organizzativa della Direzione Scientifica : ICT • Approved from “ INAF - ConsigliodiAmministrazione” on 18/06/2013 • Person in Charge: R. Smareglia • Evolution of SI (SistemiInformativi) lead by F. Pasian • Coordination of ICT • International Coordination • Horizon 2020 • Infrastructure ( es. for ESFI) • International Activity ( es. VO, Grid ) • National external Coordination • GARR • CINECA ( HPC) • POM • National Coordination • “Commissionecalcolo” + “Gruppoesecutivodicoordinamento” • Network, Computing, Archive, Software … • Coordination of internal ICT ( system manager), software ( licenses like IDL ) • DISSEMINATION

  12. SKA SKA  Phase 1 & 2 (3 years) • Telescope Manager, one of the major work package elements identified for the pre-construction phase, is responsible for the monitoring of the entire telescope, the engineering and operational status of its components and sub-systems. • Lead by India ( Yashwant Gupta, NCRA) + India, South Africa, United Kingdom, Australia, Canada, Italy, Portugal, Germany • INAF lead: (OATs)  Local Monitor and Control package • INAF involved also  System Engineering + Observation Manager • INAF  OA Trieste ( Archive & Control Groups) (~40%), OA Catania, OA Teramo, IRA • Budget: 260 K€ (Stage 1, 1 year, 09/2013-09/2014 ), 860 K€ (Stage 2, 2 years 09/2014-09/2016) • Dish, includes all activities necessary to prepare the procurement of the SKA dishes, including local monitoring & control of the individual dish in pointing and other functionality, their feeds, necessary electronics and local infrastructure. • Lead by Australia (Carole Jackson, CSIRO) + China, South Africa, UK, Swden, Australia, Canada, Italy, Portugal, Germany • INAF lead: (OACT + China )  Local Monitor and Control package • INAF  OA Catania, OA Teramo, OA Trieste ( Instrumentation & Control Group), IRA • Budget : Stage 1: 6 FTE + 70 kEuro (material & travel) // Stage 2: 12 FTE + 140 kEuro (material and travel) TM - Telescope Manager DSH – Dish Local Monitor & Control LFAA – Low Frequency Array CSP – Central Signal processor

  13. IA2 & VO budget & personal

  14. HPC and HTC • ER-flow: FP7 project for the porting of astrophysical applications on SSP (SHIWA simulations platform) and on the European DCI (since 1/9/12). 94 K€ (75 Castelli contr.) • EGI (European Grid Infrastructure) • FP7 EGI-InSPIRE until 30/4/13: project objectives achieved (VisIVO, HPC, HTC, A&A use cases, A&A requirements) • Coordination of a VT (Virtual Team) for CTA dedicated to the study of technological solutions for Science Gateways, SSO authentication and Identity Federation (from 7/1/13 to 7/7/13). In close collaboration with EGI and IGI. • IGI (Italian Grid Infrastructure): in standby waiting for the completion of the migration procedure to the GARR • CTA: Development of Science Gateways and of the SSO (Single-Sign-On) authentication system for the whole CTA collaboration. In tight coordination with OACt and with other partners/institutes involved in the project.

  15. Ma05 Critical issues • Flow of funding for long-term projects needs to be ~ constant («holes» are unacceptable! especially if contracts renewed yearly)  need INAF as a «buffer» • Continuity/career for staff; overcommittment • Electronics lab • Logistics is a problem ! • growth occurring (Euclid, IA2, etc.) • to improve interactions between ATG staff • to improve interactions with Scientific staff • Computing facilities: procurement / maintenance • Difficulties in recruiting staff with computer skills Shown last year

  16. MA05 Permanent staff needs • Need recruiting plan ! • For MA5/OATs the following would be needed in the next 5-6 years: • 1 I Lev Ricercatore (to compensate retirements) • 2 II Lev Ricercatori/Tecnologi (career path for expert staff – one position for MA5 since 1992 !!) • 4 III Lev Ricercatori/Tecnologi (keep skilled personnel, guarantee support for INAF services, guarantee continuity within international projects, …) • 2 CTER (electronics lab needed e.g. for ESPRESSO + system administration for superclusters) Now 4-5 yrs Shown last year

More Related