An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Departmentally Managed Projects Supplemental training for SoE/SEQ Facilities Managers May 19, 2014

  2. DMP Project Delivery Training • LBRE’s Online Training Covers: • Pre-Form 1 Planning • Form 1 Process • Planning and Design • Construction • Close Out

  3. Resources for DMPs

  4. DMP Supplemental Training • What will be covered: • Being a DMP Project Manager in the SoE • Running a Soup to Nuts Projects • Setting Expectations • Project Bid Package and beyond • Documentation; Specification and drawings • OAC Meetings • Schedule • Turn Over and Close Out

  5. The DMP Project Manager So You Want To Be a Project Manager

  6. Setting Expectations • Project Cost • Bench Marking • Schedule • Way too long … • You will pull permits! • Scope • What’s in and what is not…be clear • Don’t add scope after the fact without add the budget and time

  7. Roles and Responsibilities • Building Manager • Communication • Scheduling • Access • Environmental Health & Safety (“EH&S) • Run it by them … • Facility Operations (“Fac Ops”) • Improvement and Alteration work • Synergies in work • Yours and Theirs • SoE Facilities office • When to contact? Who to contact? • Brian Carilli, Assoc. Director Construction and Renovations

  8. Project Estimate

  9. Pre-construction Schedule

  10. Form 1’s • Notifies Dean’s Office and departments of work taking place • Set-up plant account to allow the work to be capitalized • Set-up the management for the project • Elaine Glatzel, Project Coordinator

  11. Specification and Drawings • Plan Spec verses Design Build • Pros and cons • Performance specification • Language used • Avoid ambiguity – Be clear on what you want! • Place onus on the contractor to bring out conflicts • A picture is worth a thousand words • Boiler Plate Specification • Construction Specification Index (“CSI) • Fac Ops • Facilities Design Guidelines (“FDG”) • Maintenance requirement • Service Areas • Special Training needed • Lab Design Guidelines

  12. CSI Index

  13. Contract Requirements • Allotting Enough Time • Request for Proposal (“RFP”) or Invitation for Bid (“IFB”) required for most projects • Competitive bid required per Admin Guide 51 • Only licensed, properly insured and bonded contractors allowed to bid work • Bonds and Bond Waivers • Bond Waiver comes from SoE Sr. Assoc Dean for Administration

  14. Bidding • Bid Package • Specification, drawings, cut sheets, bid form, etc. • Bid Walk - You do one mandatory walk • Sign In • Addendums • No verbal direction during bidding • Sub-Walks and Questions • Define when, who and how long • Access • Deadline for written questions • Bid Due Date and Time – no late bids accepted • Bid opening • What to look for: • Exceptions and exclusions • All specs, addendum, drawings received and noted on bid • Alternates • Once you have the bid in hand, confirm the bid! • Capital Projects require a minimum of 3 bids • Bringing in new contractors

  15. Other Contract Requirements • Only Procurement is approved to sign a contract!Do not sign contracts or agreements that obligate the University • Approved Form 1 • Insurance (including any special coverage needed) • Payment and Performance Bond or Letter of Credit or Bond Waiver signed by Form 1 approver • Stanford University living wage Guidelines

  16. Managing Your Project Budget

  17. Example: Kick-off Meeting Agenda • MEET Early and Meet Often • Building notification • Contractor contact • Lab contact • Fac Ops • Forms to Share Information with the Community • Notification of Stanford University Building Renovation or Maintenance Project • EH&S Guidelines for Project Managers: Minimizing Impacts on Local Building Occupants • Lab Closure and or Hazardous material abatement and clean-up (Kip Fout) • Shut downs and hot work permits • Intermediate fire inspection now required • Construction Site boundaries and facility use • Parking • Lay-down area • Emergency plan and notifications • Progress meetings and look ahead schedule • Disruptive work • Noise • Odors and EH&S submittals

  18. Pre-Construction • Emergency Contact and Plan: • Site Plan • Pre-construction Meeting • Set OAC Meet Time • Security Plan • Safety Plan for site • Building Safety Plan given to contractor • Project Schedule • Staging • Storage • Parking • Debris Boxes • Noise Requirements • Dust Protection • Temporary Fire Protection • Building Entrances and Exit Requirements • Shutdowns Procedures • Environmental Concerns review • Hazardous Material: • Asbestos • PCB • Radiological • Chemical • Gases • Decontamination • Other: • Subsurface Investigation: USA complete • Notification of Building Occupants and Surrounding Building • Health and Safety Submittals on Hazardous and Odor Producing Material • Long Lead Equipment Ordered

  19. Billing, Progress Payment • Sign-off on Invoicing • Percentages of completion • Project Name and address • You sign “Ok to Pay” • Retention (10%) • Unconditional Lien Release • Tracking budget • Shut downs • Change orders • Com services

  20. Change Orders • No verbal change orders! • Include: • Impact to schedule • Up-dates to as builts • All inclusive of new work • Missed items in bid are not change orders. • Above in the bidding you asked them to confirm their bid by doing that there is no misses allowed. • No Favors • Even if it is nice that a contractor will offer to “do you a favor” you can not accept it.

  21. Weekly Meeting - Look Ahead Schedules • OAC Meetings • Who • Project Manager • Contractor • Fac Ops • Building Manager • Faculty • What • Submittal reviews • RFI ‘s and conflicts • Shop drawings • Meeting Minutes and Schedules • By Contractor • Complete Schedule • Three week look ahead • Shut down Routine • Shutdown Long lead time • Deliveries by contractor – Deliveries come for building that tie up dock • Building disruptions

  22. Example: Meeting Minutes

  23. TCO-Final Permit-Turnover • SUFMO Testing and Sign off • Before county • County final • Health, Fire and Building • Furniture move in after TCO • Turn Over Package (Maps & Records) • Start up Fac Ops • Final walk through with Fac Ops • Sign in list • Keys, Com Services, Signage

  24. Close out • Closeout Package – link to maps & records website • O&M’s • Drawings both Hard and Soft • Signed permit (original) • Fac-Ops walkthrough sign in list • Attic Stock • Always get a signed letter of transmittal when delivered • Keep digital copy of everything YOUR PROJECT IS NOT COMPLETE UNTIL THE CLOSE OUT PACKAGE IS TURNED IN TO MAPS & RECORDS

  25. Q&A