1 / 4

CSC in the MWGR Feb.15-16

CSC in the MWGR Feb.15-16. M. Ignatenko (UCLA) CSC Operation and DPG meeting CERN February 15 , 2012. CSC wants to test. New TF firmware with 0-data suppression format . Checked in a few local runs. New ALCT firmware with 0-data suppression format . Local run were taken.

giona
Download Presentation

CSC in the MWGR Feb.15-16

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CSC in the MWGRFeb.15-16 M. Ignatenko (UCLA) CSC Operation and DPG meeting CERN February 15, 2012

  2. CSC wants to test • New TF firmware with 0-data suppression format. Checked in a few local runs. • New ALCT firmware with 0-data suppression format. Local run were taken. • New DCC firmware. Has been downloaded to the FEDs 750+751. Checked in the local run. • New DDU firmware. Has been download in all DDUs of the FED crate 1. Checked in the local run.

  3. CSC Plan • TF - take Global runs at different L1ac trigger rates (CSC 70 Hz of Cosmics+ Random triggers 40, 60, 80, and 100 kHz. • DCC+DDU 1) - Global runs at different L1ac trigger rates (CSC 70 Hz of cosmic +Random triggers 40, 60, 80, and 100 kHz) 2) - Global runs at different L1ac trigger rates (CSC radioactive trigger)

  4. MWGRun #185163 L1ac rate ~770 Hz 600 Hz random 100 Hz calibration ~70 Hz CSC 0.158% Most likely Me-3/1/03 was the source of DDU-DCC out of sync

More Related