300 likes | 427 Views
Review Time (Construction Stormwater Permit). 1. SWMP. Review Time (Construction Stormwater Permit). 1. SWMP 2. Implement BMPS. Review Time (Construction Stormwater Permit). 1. SWMP 2. Implement BMPS 3. Maintain BMPS. Review Time (Construction Stormwater Permit). 1. SWMP
E N D
Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS
Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS
Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS
Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections
Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections • 6. Record Keeping
Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections • 6. Record Keeping • 7. Final Stabilization
Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections • 6. Record Keeping • 7. Final Stabilization
Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections • 6. Record Keeping • 7. Final Stabilization
Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections • 6. Record Keeping • 7. Final Stabilization
Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections • 6. Record Keeping • 7. Final Stabilization
Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections • 6. Record Keeping • 7. Final Stabilization
Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections • 6. Record Keeping • 7. Final Stabilization
Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections • 6. Record Keeping • 7. Final Stabilization
Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575
Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575
Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575
Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575
Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575
Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575
Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575
Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575
Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575
Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575
E. SWMP contents (5 parts) • 1. Site Description • Clear description of the construction activity that addresses ALL the items (8) required by the permit
E. SWMP contents (5 parts) 2. Site Map Legible, complete and up-to-date map that addresses ALL the items (8) required by the permit State ECS training 9/07 26
E. SWMP contents (5 parts) • 3. Stormwater Management Controls Narrative description of all stormwater management controls: before, during, and after construction. Must minimally describe/identify items ALL the items (3) required by the permit • a. SWMP administrator • b. Identification of Potential Pollutant Sources
E. SWMP contents (5 parts) • 3. Stormwater Management Controls (continued) • c. BMPs and associated installation details 1. Structural BMPs 2. Non-Structural BMPs 3. How BMP implementation will be phased 4. Materials Handling and Spill Prevention 5. Dedicated Concrete or Asphalt Batch Plants 6. Vehicle Tracking Control 7. Waste management/disposal, including concrete washout 8. Groundwater and stormwater dewatering
E. SWMP contents (5 parts) • 4. Plan for Final Stabilization • All ground disturbing activities complete; and all disturbed areas built upon, paved, or hard armored, orestablished uniform vegetative cover with a density of at least 70% of predisturbance levels. • More detail than you think: • What type of cover will be used? • Specific seed mixtures and application rates? • Will the soil need to be amended? • Special methods on steep slopes/concentrated flow?
E. SWMP contents (5 parts) • 5. Inspection and Maintenance • Procedures to inspect and maintain BMPs • Inspections • Minimum: every 14 days and within 24 hours after precipitation events or snow melts. • Exception for temporarily idle sites – up to 72 hours following storm event. • Keep an inspection log. • Minimum requirements identified. • BMP maintenance – immediately in most cases