190 likes | 689 Views
CADLink: Integrate SW/EPDM to ERP . Who are we?. We connect engineering data with ERP production data. WHAT ARE CUSTOMERS DOING NOW?. Brute Force. Engineering or Planning department takes data from drawings and manually types into ERP Features Zero software cost Error prone
E N D
CADLink: Integrate SW/EPDM to ERP
Who are we? We connect engineering data with ERP production data
Brute Force • Engineering or Planning department takes data from drawings and manually types into ERP • Features • Zero software cost • Error prone • Time consuming • Positioning • Small engineering departments • Mfg of simple, repetitive products
CADLink CADLink • Single integration point for data exchange between SW/EPDM and ERP • Features: • Seamless data integration • Significant time savings, error reduction • Limited approval system • Positioning • Medium sized engineering departments • Manufacturing of make to order products or complex repetitive products
Integrate CAD Integrate and synchronize EPDM data with ERP
Features CADLink- • Direct link to: • Epicor 9, Vantage, Vista • Dynamics AX/NAV • Infor SyteLine, Visual • Push ERP description onto the drawing/model • Push Revision information to PDM and ERP Database • Update Items, Bills Of Material and Operations directly from PDM • Tie critical dimensions to your ERP BoM quantities
Benefits CADLink- • Eliminate Engineering Clerical Work • Cut Design Cost • Reduce Design Cycle Time • Reduce Data Entry Errors • Ensure consistent data between SW/EPDM and ERP • Reduce Bill Of Material errors by tying dimensions directly to BOM quantities
CADLink Right click on the model and select “RUN CADLINK”
CADLink Select the BOM you want to push and sync with your ERP
CADLink Bill Of Material information is pulled from Models and displayed for the Engineer in this grid. Discrepancy between CAD and ERP Data are highlighted
CADLink Multi Level Bill Of Material
CADLink UOM table is taken directly from your ERP Database
CADLink Bill of Material Changes Summary shows only the BOM changes that will be made to your ERP
CADLink Cost Justification • BOM Data Entry • 8 Eng X 1 hour per day = 2000 hours • Shop Floor Confusion • 1 scrapped part per year • 12 late shipments per year Total Savings of $65,000 per year
QBuild Corporation145 Renfrew Drive, Unit 140 | Markham, ON L3R 9R6 | CANADA Phone +1 905 479 7811 EXT 224 Fax +1 905 479 2636 Email: info@qbuildsoftware.com www.qbuildsoftware.com