1 / 17

No Cell Phones, Please.

No Cell Phones, Please. Thank You. Specialty Foundation Construction. Jet Grouting Drilled Micropiles Vibratory Ground Improvement & Stone Columns Construction Drilling, Grouting & Anchors. Central Artery / Tunnel Project Contract C09C1 US Interstate 90 & Interstate 93 Interchange

glorias
Download Presentation

No Cell Phones, Please.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. No Cell Phones, Please. Thank You.

  2. Specialty Foundation Construction Jet Grouting Drilled Micropiles Vibratory Ground Improvement & Stone Columns Construction Drilling, Grouting & Anchors Central Artery / Tunnel Project Contract C09C1 US Interstate 90 & Interstate 93 Interchange Boston, Massachusetts Presented By: Pier Luigi Iovino, Division President Division of Layne Christensen Company

  3. Design Applications APPLICATIONS… • Temporary Condition • Underpinning support of an abutment • 22 drilled micropiles installed • Permanent Foundation Support • Support for new bridge foundation • 90 drilled micropiles installed

  4. Design Applications INSTALLATION TECHNIQUES… • Drilled micropiles were steel reinforced and cement grouted with a minimum rock socket diameter of 8-inches. • Rotary drilling technique utilized, with a permanent 5.5-inch O.D. steel casing connected to a 7-7/8-inch O.D. drill bit.

  5. Design Applications SIGNIFICANCE… • Central Artery/Tunnel (CA/T) project is funded through the US Federal Highway Administration (FHWA). • Drilled micropiles are newly accepted method in US. • Drilled micropiles used as permanent bridge foundation component for FHWA funded project. • de facto acceptance of drilled micropiles as viable solution.

  6. Design Considerations THREE COMPONENTS… • Threaded casing test results • tension; compression and bending • Structural / Seismic • Geotechnical

  7. Temporary Condition

  8. Temporary Condition STRUCTURAL CONSIDERATIONS… • Pile Capacity = 67 tons / 134 kips. • Pile Diameter = 8 inches • Allowable design compressive stress of grout = 4,000 x 0.33 psi.

  9. Temporary Condition GEOTECHNICAL CONSIDERATIONS… • Bearing stratum in bedrock. • Allowable friction stress in bedrock = 45 psi. • Length of rock socket = • 134 x 1000/(8 x 3.14 x 45 x 12) • = 9.87 feet • Pile lengths to be 100 to 135 feet with 10 feet into bedrock.

  10. Installation of Drilled Micropiles for Temporary Underpinning of Abutment Drilled piles were installed in low headroom as part of a value engineered proposal replacing contract design of driven piles.

  11. Permanent Foundation Support

  12. Permanent Foundation Support STRUCTURAL CONSIDERATIONS… • Pile Capacity = 100 tons / 80 kips. • Pile Lateral Capacity = 2 kips. • Pile Diameter = 9 inches. • Steel pipe to be 7 inches diameter, O.D. t=0.5” N-80 steel. • Allowable design compressive stress of grout = 4,000 x 0.33 psi.

  13. Permanent Foundation Support GEOTECHNICAL CONSIDERATIONS… • Bearing stratum in bedrock. • Pile to be minimum 12 feet into bedrock. • Skin friction area = • 9 x 3.14 x 12 x 12 • = 4069.4 sq. in. • Rock/grout friction stress = • 200 x 1000/4069.4 • = 49.1 psi

  14. Pile Load Test Frame

  15. Pile Load Test Frame

  16. Installation of Drilled Micropiles for Permanent Bridge Foundation Support

  17. Experienced. Equipped. Committed. Boston • Richmond • Salt Lake City • Los Angeles • Seattle Pittsburgh • Hawaii • Puerto Rico • Italy www.laynechristensen.com • 888-79-LAYNE

More Related