An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Highly Modified Binder Yield Performance Gains for I-40 Project 17th Annual Conference & Workshop Grand Hyatt Seattle, Washington February 9-11, 2016 Kenneth Ray Hobson, P.E.

  2. Outline • NCAT 2009 Cycle N8 • Caddo County I-40 • 3 Year Fatigue Research at OU • LTPP SPS-10 • Wagoner County GTR • Conclusions

  3. OK N9-N8 Sections

  4. NCAT 2009 Cycle N8 OK Sections http://pavetrack.com/construction.htm

  5. NCAT 2009 Cycle N8 • 2006 Cycle Perpetual 10″ thick Experiment • Failed after 10 MESALs • 2009 Cycle • Milled and Replaced  5.0″ • Two Fabric Types • Delay Bottom-up Fatigue

  6. NCAT 2009 Cycle N8

  7. NCAT 2009 Cycle N8 - Failure

  8. NCAT 2009 Cycle N8 • After 3.5 MESALs • Mill and Replace (PG 76E-28) • 1.25″ — 3/8″ [9.5 mm] NMAS • 3.25″ — 3/4″ [19 mm] NMAS • 1.25 ″ — 3/8″ [9.5 mm] NMAS • RIL (+0.2% Pb)

  9. NCAT 2009 Cycle N8 • Lasted 16.2 MESALs

  10. Caddo County I-40 MP 102-104

  11. Caddo County I-40 – 10/12 • Mill 5″ & Replace (PG 76E-28) • 3/4″ — OGFSC (PG 70-28 OK) • 1.5″ — 3/8″ [9.5 mm] NMAS S5 • 2.5″ — 3/4″ [19 mm] NMAS S3 • 2.5″ — 3/4″ [19 mm] NMAS S3 • 1.5″ — 3/8″ [9.5 mm] NMAS S5 • RIL (+0.2% Pb)

  12. Caddo County I-40 – TFHRC

  13. Caddo County I-40 – TFHRC Damage

  14. Caddo County I-40 – 1/21/16

  15. 3 Year Fatigue Research at OU • Select Best Fatigue Test for ODOT • Specify Fatigue Test Limits • Draft Fatigue Test Method if Needed

  16. 3 Year Fatigue Research at OU • Purchase and Install Fatigue Test Equipment at ODOT • Purchase and Install AMPT at ODOT • Train ODOT Personnel

  17. 3 Year Fatigue Research at OU • Chose SCB-LTRC Test Method • Delay Final for LTPP SPS-10 Research

  18. LTPP SPS-10

  19. LTPP SPS-10

  20. LTPP SPS-10 – SCB-LTRC

  21. LTPP SPS-10

  22. LTPP SPS-10 Min.

  23. LTPP SPS-10

  24. Wagoner County GTR

  25. Wagoner County GTR

  26. Wagoner County GTR • ODEQ Sponsored Research • OU GTR Literature Review • ODOT FWD Tests • ODOT GTR Mix Designs • OU SCB-LTRC Tests

  27. Conclusions • Based on N8 and Caddo County Experience and NCAT SN of 0.54 • Design Thickness -20%

  28. Conclusions – SN 0.44=7″ HMA

  29. Conclusions – SN 0.54=5.5″ HMA

  30. Conclusions • ODOT Adopt Fatigue Test 2018 • Dynamic Modulus • LTPP SPS-10 Fatigue Tests Complete Late 2016 • Wagoner County GTR • Construct Spring 2016 • Fatigue Performance is Key