1 / 12

MEG: past present and future

MEG: past present and future. (Status and prospects). Hit map 2008. 2009. Past: february – august 2009. Intensive work on understanding instability problem on DCHs – finally found problem in HV distribution cards All chambers repaired before start of 2009 beam time: MH.

goldy
Download Presentation

MEG: past present and future

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MEG: past present and future (Status and prospects) A.M. Baldini PSI February 17° 2010

  2. Hit map 2008 2009 Past: february – august 2009 • Intensive work on understanding instability problem on DCHs – finally found problem in HV distribution cards • All chambers repaired before start of 2009 beam time: MH A.M. Baldini PSI February 17° 2010

  3. Past: february – august 2009 • New Xe purification system in liquid phase installed with new “silent” purification pump (usable during runs): SM A.M. Baldini PSI February 17° 2010

  4. Past: february – august 2009 • Meanwhile intense work on analysis of 2008 data (being sub. To NPB) Despite sensitivity similar to MEGA FC A.M. Baldini PSI February 17° 2010

  5. Past: 2008 data analysis A.M. Baldini PSI February 17° 2010

  6. Past: 2009 run, Aug. Dec. A.M. Baldini PSI February 17° 2010

  7. Past: 2009 run, Aug. Dec. • Shortening of the beam time period  reduce beam tests and tests on individual detectors • APDs (modified for being inserted in trigger) : noise on DCHs  could not be used in data taking: FG • DRS4: long start-up procedure: ok ghost pulse removal + temperature dependence but still timing problems between different boards/chips: SR • Plus: problems with m beam settings: PRK A.M. Baldini PSI February 17° 2010

  8. Present: 2009 analysis RS, WM, CV Likelihood analysis A.M. Baldini PSI February 17° 2010

  9. Future: 2010 • Understand the reason of the bad timing measurements between different DRS boards/chips SR • Analysis improvements and better knowledge of the apparatus • Build and install chambers with new cathode foils (found some with defects: MH) • Monochromatic positron beam: Mott scattering on a calibration target AP A.M. Baldini PSI February 17° 2010

  10. Future: 2010 Asymmetric Box analysis A.M. Baldini PSI February 17° 2010

  11. Future: 201x; very preliminary 0.5*SES (e+ eff.) and 10 * bkg (2 from Pe+, 2 from timing, 2 from e+ angle) Enter in steady run conditions before proposing upgrades A.M. Baldini PSI February 17° 2010

  12. 2010 shedule A.M. Baldini PSI February 17° 2010

More Related