Global Weather Prediction - Possible developments in the next decades-

Global Weather Prediction - Possible developments in the next decades-. Professor Lennart Bengtsson ESSC, University of Reading MPI for Meteorology, Hamburg. Global Weather Prediction - Possible developments in the next decades-. Introduction (some personal remarks)

gordy
Download Presentation

Global Weather Prediction - Possible developments in the next decades-

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Global Weather Prediction-Possible developments in the next decades- Professor Lennart Bengtsson ESSC, University of Reading MPI for Meteorology, Hamburg

  2. Global Weather Prediction-Possible developments in the next decades- • Introduction (some personal remarks) • Predictive skill in NWP • The future of NWP • Concluding remarks

  3. The First Operational NWP • October 1954, “ Dalamanövern“ • Meteorological Institute, Stockholm • and the Swedish Airforce

  4. The First Operational NWP

  5. The First Operational NWP

  6. The First Operational NWP

  7. Predictive skill and Predictability Northern hemisphere 500hPa height Winter

  8. Predicting super hurricane Floyd at ECMWF

  9. The future of NWP • Modeling and data-assimilation • Extended predictions • Computational possibilities • Provisions of forecast information to users

  10. L.F. Richardson, 1922“Imagine a large hall like a theatre, except that the circles and the galleries go rightround through the space usually occupied by the stage. The walls of this chamber are painted to form a map of the globe. The ceiling represents the north polar regions, the tropics in the upper circle, and the antarctic in the pit. A myriad computers are at work upon the weather of the part of the map where each sits, but each computer attends only to one equation or part of an equation. The work of each region is co-ordinated by an official of higher rank. Numerous little “night signs” display the instantaneous values so that neighbouring computers can read them. From the floor of the pit a tall pillar rises to half the height of the hall. It carries a large pulpit on its top. In this sits the man in charge of the whole theatre. One of his duties is to maintain a uniform speed of progress in all parts of the globe. In this respect he is like the conductor of an orchestra in which the instruments are slide-rules and calculating machines. But instead of waving a baton he turns a beam of rosy light upon any region that is running ahead of the rest, and a beam of blue light upon those who are behindhand.Four senior clerks at the central pulpit are collecting the future weather as its is being computed, and despatching it by pneumatic carrier to a quiet room. There it will be coded and telephoned to the radio transmitting stations”

  11. Richardson‘s dream

  12. Modeling and data-assimilation • Ensemble prediction • Non-hydrostatic models • Resolution issues • Physical parameterization • Data-assimilation

  13. Ensemble prediction

  14. Predictability of weather

  15. 1 Feb 1953 00UTCSurface Pressure & Gusts Analysis

  16. Surface Pressure 1 Feb 1953 00UTCAnalysis Forecast +1 Day

  17. Surface Pressure 1 Feb 1953 00UTCAnalysis Forecast +1.5 Day

  18. Surface Pressure 1 Feb 1953 00UTCAnalysis Forecast +2 Day

  19. 10 m Gusts 1 Feb 1953 00UTCAnalysis Forecast +1 Day

  20. 10 m Gusts 1 Feb 1953 00UTCAnalysis Forecast +1.5 Day

  21. 10 m Gusts 1 Feb 1953 00UTCAnalysis Forecast +2 Day

  22. Ensemble Forecasts: D+3.5

  23. Ensemble Forecasts: D+4.5

  24. Data assimilation • The physical aspects of data-assimilation • ( What are the key observations?) • Coupled atmosphere - ocean models

  25. Extended predictionWhere are the limits?

  26. Predictive skill and Predictability Northern hemisphere 500hPa height Winter

  27. An example of potential super-predictability • Simulation of QBO • Giorgetta et al., 2003 • ECHAM 5: T42/L90

  28. Supercomputer performance • 1970s Mega flops • 1990s Giga flops • 2000s Tera flops • 2010s Peta flops • 2020s Exa flops?

  29. Weather on InternetICM Warsaw • 48hr forecasts four times a day • (http://weather.icm.edu.pl/english/weathfrcst/weatherforecast.html) • Meteogrammes • (http://weather.icm.edu.pl/index2eng.php?ver=)

  30. meteorogram number : x = 4, y = 17 19.05.2004 , start t0 0:00 GMT

  31. Concluding remarksNWP in the future • Non-hydrostatic models and advanced data-assimilation • Increased skill in predicting extreme events • Ensemble prediction for all time-scales • Major improvements in extended prediction • Very powerful computers and communication systems will change the way NWP is being done today • Major changes in the global structure of NWP • Many users will be making their own forecasts

  32. END