An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress Report

  2. Objectives and Content of the Progress Report • Presents a review of progress made on a project or an activity • Contents concern: • Progress made • Problems encountered • Projections of future progress • Format – depends upon formality and audience • Formality depends upon audience and protocol - most are informal • Narrative reports

  3. Individual Progress Report Assignment Individual Progress Report Assignment • Objective: Report about conditions as they exist. • Order: Direct (deductive) Study Notes pp. 29 - 30 • Format: Max. 2-page memorandum • Informal Graphics: NO • Assignment & Case: See handout.

  4. Direct Order in Progress Report • Preceding the major factors and details are any needed introductory materials, i.e., the introductory paragraph (no heading). • In each section (with headings), information moves from major factors to the detailspertaining to each factor. • Include a closing paragraph (no heading).

  5. Content of the Progress Report • Introduction (no heading) – includes WHAT, WHY, BACKGROUND, (if necessary), SCOPE (dates being reported), and PREVIEW • Work Completedand Problems Encountered (heading) – steps completed and problems confronted (and how resolved). Problems Encountered may be a separate section. • Work Scheduled(heading) – what remains to be done, deadlines for completion (possibly includes a schedule with specific dates) • Closing(no heading) –encourages feedback, goodwill, and contact information

  6. Include headings(except for introduction, summary and closing) • We discussed construction of headings in the previous PowerPoint lecture: Organizing Information for a Report. You should also review Study Notes, pp. 18-19. As stated on page 18, short reports use Level 1 and 3 headings. Format as shown.

  7. Include a headerusing Office 2007 Click on the Insert tab, then on the Header icon located in the Header & Footer group. Choose Blank (Three Columns) header format. Click in first text box and add appropriate information. Click in middle text box and then on Date & Time in the Insert group on the Header & Footer Tools Design tab, and select appropriate date format. Click on right text box, then on Page Number icon and choose Current Position – Plain Number. Click on Different First Page check box in Options group.

  8. Example at Website http://misnt.indstate.edu/wilhelm/ASBE%20336/1_BEIT%20336%20Homepage.htm