150 likes | 164 Views
Students will design and build lightweight towers to hold the maximum weight possible. General rules and parameters must be followed. Scoring is based on load supported and tower mass.
E N D
Towers B & C – 2010-11 CeAnn Chalker ceann@chalker.org
Disclaimer • This presentation was prepared using draft rules. There may be some changes in the final copy of the rules. The rules which will be in your Coaches Manual and Student Manuals will be the official rules.
Towers • Students will design and build the lightest structure holding the greatest amount of weight.
General Rules • Only 1 structure entered per team • No Impound • Testing maximum load 15 kg • Students must wear goggles • Towers must be marked by team so judges can identify them • Tower is a single structure (no separate or detachable pieces)
Towers Construction • Towers must be made of only wood and bonding glue (any type of glue) • No particle board, plywood, beaverboard, or other composite wood are allowed (this includes bamboo and paper) • Unlimited laminations by students is allowed • No limit on the cross section size of individual pieces of wood
Towers Parameters • Must accommodate a loading block that is 5.0cm x 5.0cm x 2.0cm w/a ¼ inch diameter hole in the center • Height – All parts of the loading block must be a minimum 50.0 cm above the platform (no max.) • The base of the Tower must span the testing platform which has a 20.0 cm x 20.0 cm square opening
Towers Parameters • No portion of the Tower may extend below the top surface of the testing platform • The Tower may not be braced against the edge of the Test Base • After set up, the Tower may only contact the Loading Block and the Test Base
Towers Parameters • Division B Parameters • The portion of the tower more than 30.0 cm above the test base must pass through an 8.0 cm diameter hole or opening • Division C Parameters • The portion of the tower more than15 cm above the test base must pass through an 8.0 cm diameter hole or opening
Towers Testing • A chain and bucket will be suspended from the loading block • Structures will be tested by loading sand into the bucket up to 15 kg. • Students will be the only ones to handle their structures
Towers Testing cont’d • Students may adjust the tower until they begin loading the sand • Teams are given 10 minutes to load the sand into the bucket
Towers Testing cont’d • Sand loading stops – • When failure of the tower occurs • When maximum load is supported (15 kg) • When the chain comes in contact with the tower • When any part of the tower extends below the top surface of the Test Base
Towers Testing cont’d • Load Supported includes – • Loading block • Eyebolt • Washer • Wing nut • Bucket • Sand
Towers Scoring Formula • Score= Load Supported (grams)2/Mass of Tower(grams) • Highest Score wins • Tie Breaker • Ties will be broken in favor of the lighter structure
Towers Tiers • 1st Tier • Tower meets all Construction Parameters • 2nd Tier • Tower does not meet one or more Construction Parameters
Towers Tiers cont’d • 3rd Tier • Structure can not be tested for any reason will be ranked by the lowest mass