CanSat 2011 CDR Outline Version 0.2. Your Team # Here Your Team Name Here. Presentation Outline. Provide a simple outline of the presentation If possible, indicate the team member(s) who will be presenting each section. Team Organization.

grace
Download Presentation

CanSat 2011 CDR Outline Version 0.2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CanSat 2011 CDR OutlineVersion 0.2 Your Team # Here Your Team Name Here CanSat 2012 CDR: Team ### (Team Name)

  2. Presentation Outline • Provide a simple outline of the presentation • If possible, indicate the team member(s) who will be presenting each section CanSat 2012 CDR: Team ### (Team Name)

  3. Team Organization • Single slide listing the team members and their roles • If possible, please include year (freshman, sophomore, etc.) for reference • This only needs to be provided once for team members showing up multiple times on the org chart • Good format is the use of an organization chart, such as below: Sample CanSat 2012 CDR: Team ### (Team Name)

  4. Acronyms • Provide a list of acronyms used throughout the presentation. • DURING PRESENTATIONS – DO NOT READ THROUGH THESE ACRONYMS CanSat 2012 CDR: Team ### (Team Name)

  5. The purpose of this section is to introduce the reviewer to the overall requirements and configuration of the CanSat. This provides a basis for the details presented in the subsystem sections. Systems Overview Presenter Name(s) Go Here CanSat 2012 CDR: Team ### (Team Name)

  6. Mission Summary • Overview of the mission objectives • Indicate which one (1) selectable objective is being attempted • Selection rationale? • Also include any external objectives (personal, laboratory or sponsor, class, etc.) relevant to the design CanSat 2012 CDR: Team ### (Team Name)

  7. Summary of Changes Since PDR • Overview design changes since PDR • Details of the changes are discussed in subsequent sections. CanSat 2012 CDR: Team ### (Team Name)

  8. System Requirements • Table of system (mission) level requirements • This chart may be expanded to multiple charts as needed • See Competition Guide for more information on format and content • DO NOT READ THROUGH THE REQUIREMENTS DURING THE PRESENTATION – HIT HIGHLIGHT (IMPORTANT REQUIREMENTS) & GIVE A FEW MOMENTS FOR REVIEWERS TO LOOK THROUGH THE REQUIREMENTS BUT DO NOT READ THROUGH EACH REQUIREMENT • This holds for ALL discussion of requirements throughout the presentation CanSat 2012 CDR: Team ### (Team Name)

  9. System Concept of Operations • 1-3 slides (roughly) providing overview of CanSat operations • Should include • Pre-launch activities • Launch and descent operations • Post-launch recovery and data reduction • Focus on launch day activities • Team member roles and responsibilities on launch day • Simple flow diagrams and cartoons are a good way to present the CONOPS CanSat 2012 CDR: Team ### (Team Name)

  10. Physical Layout • Diagram(s) showing physical layout of selected CanSat configuration • Make sure to include: • Dimensions • Placement of major components • Relevant configurations • Carrier, lander, launch configuration, deployed, etc. • The goal is to present the physical idea of what the CanSat will look like for reference prior to getting into details of the CanSat design CanSat 2012 CDR: Team ### (Team Name)

  11. Launch Vehicle Compatibility • Discussion of how the CanSats are integrated into the rocket payload section • Discussion of how the CanSat compatibility will be verified prior to launch day • Include a dimensioned drawing that shows clearances with the payload section • Focus on launch configuration (carrier + lander) • Include all descent control apparatus • At CDR this should include measured and/or prototype dimensions • Notes: • In past years there were a large number of CanSats that did not deploy from the payload sections of the rocket CanSat 2012 CDR: Team ### (Team Name)

  12. Sensor Subsystem Design Presenter Name(s) Go Here CanSat 2012 CDR: Team ### (Team Name)

  13. Sensor Subsystem Overview • One slide providing an overview of the CanSat sensor system • Include summary of the selected sensors (type & models) • Include brief discussion of what the sensors are used for • Focus on selected component (not all components trades) • Include overview of both carrier and lander sensors, as applicable CanSat 2012 CDR: Team ### (Team Name)

  14. Sensor Subsystem Requirements • Examples of what these requirements should include: • Required sensor data ranges and resolutions • Operating voltage ranges • Data interfaces • Data rates CanSat 2012 CDR: Team ### (Team Name)

  15. Sensor Changes Since PDR • ONE slide providing an overview of the CanSat sensor system changes since PDR • Include rationale • Include changes to both carrier and lander sensors CanSat 2012 CDR: Team ### (Team Name)

  16. Carrier GPS Summary • Summary of GPS sensor selection and characteristics • Include: • GPS data accuracy and data format • Overview of data processing (including equations, as appropriate) CanSat 2012 CDR: Team ### (Team Name)

  17. Carrier Non-GPS Altitude Sensor Summary • Summary of altitude sensor selection and characteristics • Include: • Sensor accuracy and data format • Overview of data processing (including equations, as appropriate) CanSat 2012 CDR: Team ### (Team Name)

  18. Carrier Air Temperature Summary • Summary of air temperature sensor selection and characteristics • Include: • Sensor accuracy and data format • Overview of data formats (including equations, as appropriate) CanSat 2012 CDR: Team ### (Team Name)

  19. Lander Altitude Sensor Summary • Summary of lander altitude sensor selection and characteristics • Include: • Sensor accuracy and data format • Overview of data formats (including equations, as appropriate) CanSat 2012 CDR: Team ### (Team Name)

  20. Lander Impact Force Sensor Summary • SELECTABLE OBJECTIVE – ONLY REQUIRED IF SELECTED • Summary of sensor selection and characteristics • Include: • Sensor accuracy and data format • Overview of data processing (including equations, as appropriate) CanSat 2012 CDR: Team ### (Team Name)

  21. Carrier Camera Summary • SELECTABLE OBJECTIVE – ONLY REQUIRED IF SELECTED • Summary of camera selection and characteristics • Include: • Image resolution • Data formats • How images are handled onboard and reconstructed on the ground CanSat 2012 CDR: Team ### (Team Name)

  22. Carrier Video Camera Trade & Selection • SELECTABLE OBJECTIVE – ONLY REQUIRED IF SELECTED • Image resolution • Data formats • Frame rate • How images are handled, stored onboard, and reconstructed on the ground Presenter: Name goes here CanSat 2012 CDR: Team ### (Team Name)

  23. Lander Video Camera Trade & Selection • SELECTABLE OBJECTIVE – ONLY REQUIRED IF SELECTED • Image resolution • Data formats • Frame rate • How images are handled, stored onboard, and reconstructed on the ground Presenter: Name goes here CanSat 2012 CDR: Team ### (Team Name)

  24. Descent Control Design Presenter Name(s) Go Here CanSat 2012 CDR: Team ### (Team Name)

  25. Descent Control Overview • ONE slide providing an overview of the carrier and lander descent control system • Include overview of the selected configurations and components necessary CanSat 2012 CDR: Team ### (Team Name)

  26. Descent Control Changes Since PDR • List changes since the PDR for both Carrier and Lander CanSat 2012 CDR: Team ### (Team Name)

  27. Descent Control Requirements • Examples of what these requirements should include: • Volume constraints • Packaging • Masses • Target descent rates • Deployment mechanisms • There should be separate requirements for the carrier, lander, and • CanSat system, as applicable. CanSat 2012 CDR: Team ### (Team Name)

  28. Carrier Descent Control Hardware Summary • Summary of Carrier DCS sensors and actuator selection and characteristics • Shock force survival • Preflight Review testability • For passive components, discuss: • Component sizing • Key design considerations • Color selection(s) • For active components, discuss: • Sensor accuracy and data formats • Overview of sensor data processing • Actuator control, command rates, and data formats CanSat 2012 CDR: Team ### (Team Name)

  29. Lander Descent Control Hardware Summary • Summary of Lander DCS sensors and actuator selection and characteristics • Include deployment trigger and mechanism • For passive components, discuss: • Component sizing • Key design considerations • Color selection(s) • For active components, discuss: • Sensor accuracy and data formats • Overview of sensor data processing • Actuator control, command rates, and data formats CanSat 2012 CDR: Team ### (Team Name)

  30. Descent Rate Estimates • Cover estimates for the following CanSat configurations • Carrier + lander post separation (prior to deployment of the lander) • Carrier following deployment of the lander • Lander following separation from the carrier • Include discussion of • Calculations used • Assumptions • This discussion can carrier over to multiple slides if necessary CanSat 2012 CDR: Team ### (Team Name)

  31. Mechanical Subsystem Design Presenter Name(s) Go Here CanSat 2012 CDR: Team ### (Team Name)

  32. Mechanical Subsystem Overview • ONE slide providing overview of the mechanical subsystem • Include overview of major structural elements, material selection, and interface definitions CanSat 2012 CDR: Team ### (Team Name)

  33. Mechanical Subsystem Changes Since PDR • Highlight mechanical changes since PDR. Details should be discussed on subsequent slides. CanSat 2012 CDR: Team ### (Team Name)

  34. Mechanical Subsystem Requirements • Examples of what these requirements should include: • Mass allocations • Volume and dimensions constraints • Structural strength/load requirements • There may be separate requirements for the carrier, lander, and • CanSat system, as applicable. CanSat 2012 CDR: Team ### (Team Name)

  35. Lander Egg Protection Overview • Details of how the egg will be protected during flight and landing CanSat 2012 CDR: Team ### (Team Name)

  36. Mechanical Layout of Components • Dimensioned diagrams showing: • Major structural elements • Overall dimensions of the CanSat • Component presentation CanSat 2012 CDR: Team ### (Team Name)

  37. Material Selections • Discussion of what materials will be used for the mechanical components and why CanSat 2012 CDR: Team ### (Team Name)

  38. Carrier-Lander Interface • DESCRIBES HOW THE LANDER WILL BE CONNECTED TO AND RELEASED (MECHANICALLY) FROM THE CARRIER • Needs to include discussion of how descent control apparatus will be accommodated Presenter: Name goes here CanSat 2012 PDR: Team ### (Team Name)

  39. Carrier-Lander Interface • Describe how the lander will be connected to and released (mechanically) from the carrier • Needs to include discussion of how descent control apparatus will be accommodated • Redundancy / failure modes? CanSat 2012 CDR: Team ### (Team Name)

  40. Structure and Survivability • For both Carrier and Lander discuss: • Electronic component mounting methods • Electronic component enclosures • Acceleration and shock force requirements and testing CanSat 2012 CDR: Team ### (Team Name)

  41. Mass Budget • Table(s) providing the following: • Mass of all components • Mass of all structural elements • Sources/uncertainties – whether the masses are estimates, from data sheets, measured values, etc. • Total mass • Margins • Must clearly distinguish between carrier and lander masses • Include allocated mass for egg payload CanSat 2012 CDR: Team ### (Team Name)

  42. Communication and Data Handling Subsystem Design Presenter Name(s) Go Here CanSat 2012 CDR: Team ### (Team Name)

  43. CDH Overview • ONE slide providing overview of the CDH subsystem • Should include selected components (with brief mention of what each component is for) CanSat 2012 CDR: Team ### (Team Name)

  44. CDH Changes Since PDR • List changes to the CDH since PDR. Details of the changes should be discussed in subsequent slides. CanSat 2012 CDR: Team ### (Team Name)

  45. CDH Requirements • Examples of what these requirements should include: • Processor speeds • Memory requirements • I/O ports (number & types) • There should be separate requirements for the carrier, lander, and • CanSat system, as applicable. Presenter: Name goes here CanSat 2012 CDR: Team ### (Team Name)

  46. Processor & Memory Selection • Include processor speed • Include data interfaces (types and numbers) • Include memory storage requirements, if applicable • Discussion for both Carrier and Lander • May be more than one slide if necessary CanSat 2012 CDR: Team ### (Team Name)

  47. Carrier Antenna Selection • Description and characteristics of the antenna selected for the CanSat • Consider: • Performance • Mass CanSat 2012 CDR: Team ### (Team Name)

  48. Data Package Definitions • Demonstrate an understanding of the communications protocols and packets for each component of the Carrier and Lander design • Radio • GPS • Other sensors • Optional sensors (camera / impact force sensor) • Storage device protocols CanSat 2012 CDR: Team ### (Team Name)

  49. Radio Configuration • Demonstrate an understanding of the protocol required to initialize and utilize the XBEE radio module • Provide description of the impact those requirements have on the CanSat design • Include transmission control • How is this managed during each mission phase? • Prototype progress and testing results to date • Note: • Communications failures have occurred often over the past several years of the competition • You are encouraged to use your radios in all of your development and testing to better ensure mission success Complete Radio Prototyping and Testing Early! CanSat 2012 CDR: Team ### (Team Name)

  50. Carrier Telemetry Format • What data is included? • Data rate of packet? • How is data formatted? • Include example frames with descriptions CanSat 2012 CDR: Team ### (Team Name)