1 / 10

EURO 

EURO . A High Intensity Neutrino Oscillation Facility in Europe. Introduction Superbeam Neutrino Factory Beta beams Detectors Physics Possible next steps. EUROnu. FP7 Design Study

graceland
Download Presentation

EURO 

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EURO A High Intensity Neutrino Oscillation Facility in Europe • Introduction • Superbeam • Neutrino Factory • Beta beams • Detectors • Physics • Possible next steps

  2. EUROnu • FP7 Design Study • Due to limited funds: focus on possible “next” generation neutrino oscillation facilities in Europe • CERN to Frejus superbeam • Neutrino Factory (in collab. with IDS-NF) • Beta beams • + performance of baseline detectors and physics reach • Output: comparison of physics, “cost” & risk • Reported to CERN Council via SG/ECFA • Project started: 1st September 2008 • Duration: 4 years – completion in August 2012

  3. Partners

  4. EUROnu Status • Baselines largely defined • Design work still continues • Moving more towards “engineering” • Costing: • WBS being done • Framework being created using cost tool • Workshop planned soon • Safety and risk also to be done • Midterm technical review on 14th April • 17 months left!

  5. Super-Beam • Design of CERN to Frejus SB based on SPL

  6. Neutrino Factory • Close collaboration with IDS-NF • IDR completed Muon front-end Muon acceleration

  7. Beta-Beam • Main issue in EUROnu: maximise ion production • 2 options being considered: - 6He & 18Ne → baseline - 8Li & 8B back-up

  8. 50-100 m 15 m n beam 50-100kT 15 m B=1 T iron (3 cm) + scintillators (2cm) • Limited funding: only performance and “cost” • Concentrate on baseline detectors • Magnetised Iron Neutrino Detector - NF • Large water cherenkov – SB and BB • Near detectors • Closely linked to IDS Detectors

  9. Physics performance • Optimisation: • baselines and energies • synergies: experimental setups and facilities • Systematics Physics

  10. Next Steps • Technical review: 14th April • ECFA Neutrino Panel: now! • CERN Strategy Review: kick-off this summer finish next summer/autumn • EUROnu contribution under discussion: - input before EUROnu finished - agreement is combined input from: EUROnu LAGUNA-LBNO IDS etc • EUROnu final report will also go to Council • EUROnu future: also under discussion - would like to continue - how needs to be determined

More Related