1 / 15

Unit 5 Assignment

Unit 5 Assignment. Project Changes Charles W. Jansen, II Kaplan University IT499-01 Bachelors Capstone in Information Technology Instructor: Allison Selby June 14, 2012. (Fictitious network consultant) 6838 Old Banyan Way Naples, FL 34109 (239) 273-8604 chuckamania@chuckamania.net.

Download Presentation

Unit 5 Assignment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Unit 5 Assignment Project Changes Charles W. Jansen, II Kaplan University IT499-01 Bachelors Capstone in Information Technology Instructor: Allison Selby June 14, 2012

  2. (Fictitious network consultant) 6838 Old Banyan Way Naples, FL 34109 (239) 273-8604 chuckamania@chuckamania.net

  3. Project Client (fictitious) • Current company profile • Company Produces: • Video Games • Commercials • Documentaries • Video Restoration & Transfer Service • 70mm • 35mm • 16mm • 8mm Patch Productions 1066 Big Picture Blvd Naples, FL 34104 (239) 555-1066 • Currently employs several hundred people • Will add over one hundred new hires

  4. Project Goal • Add new department for developing theatrical film production offices. • Chuckamania Productions will install network equipment in the building. • Equipment will include: • Routers • Switches • Wiring Closet • New IP addressing scheme • Servers, computers and printers will be provided by separate firms. • IPS and Firewall services will be provided by Corero Network Security

  5. Changes • Change Order One • Reduce Budget by 10% • Possible Solutions • Reduce Staffing • Reduce Functionality • Modify Schedule • Change Order Two • Loss of Project Team Member • Possible Solutions • Staff picks up extra tasks • Bring in new member

  6. Change One: Reduced Budget • Budget reduced by 10% • Reduce the budget for the switches. • Replace the Cisco Catalyst WS-C3750X-48T-L switches • Use the Cisco Catalyst C2960S-48TS-L switches • Effect • Will lose some advanced capabilities • Power over Ethernet • Reduced QoS • Lose 10GB uplinks between switches • Maintains • Gigabit Ethernet capabilities • Scalability • IP Phone capable (will require AC power to be supplied by outlet to each IP Phone • Adjusted team costs • Project Manager hours adjusted – reduced time for meetings

  7. Change Two • Loss of team member • Gloria Howard has been assigned as Project Manager to another project • Replaced by another of Chuckamania Productions fine staff • Raiko Nakamura • CCNA certified • Specialized field setup • Two years with company • Same rate of pay • Net hours reduced • Minor savings

  8. New Switch Specifications • Cisco Catalyst Switch 2960 S-48TS-L • 48 Ethernet Ports • 10/100/1000 Ports • 4 One Gigabit Ethernet SFP Ports (Modular) uplinks • Smart operations • AutoQoS • VLAN • Separate VoIP VLAN • VTP (VLAN Trunking Protocol) • Advanced Intelligent Network Management Tools • Borderless security • Threat defense

  9. Old Budget

  10. New Budget

  11. Effect on Schedule • Ordering of Material • No effect • Change made before equipment was ordered • Configuration for switches not started yet • Schedule • Schedule stays on deadline • Project manager C W Jansen II picks up slack in work • Reduce time for meetings with Patch Productions • Will be more active in configuration and installation • This will reduce cost slightly • New team member Raiko Nakamura will only be scheduled where necessary • Net cost slightly reduced • Takes over some WBS tasks

  12. Progress • Cabling • Inspected and certified • Cat 6 UTP Ethernet cable with RJ-45 connectors • Plenum cable exists in crawl spaces • Patch panel numbering • Matches in • All floors building 2 and 3 • Floors 1-3 in building 1 • Does not match in • Fourth floor building 1 • This will be rectified during wiring closet management portion of installation

  13. Summary • Changes will effect feature set of switches. Switches will still be functional. Uplinks (links between switches or switches and router) will be reduced from 10GB to 1GB. Switches will perform required tasks and still provide scalability at reduced cost. • Replacement of team member reduces overall cost as new member will not be available until after configurations are finished. Project manager will pick up this slack without increasing time worked. This means a change from a primarily supervisory role to that of a participatory role. • Project manager hours decreased by reducing meeting times with client as per conversation with Natalie Kalmus and Cecil B. Miller.

  14. References • APC by Schneider Electric. (2012). APC Smart-UPS 2000VA RM 2U LCD 120V. Retrieved June 9, 2012, from American Power Conversion: http://www.apc.com/products/resource/include/techspec_index.cfm?base_sku=SMT2200RM2U&total_watts=50 • C2G. (2012). 5 ft. Cat6 550 MHz Snagless Patch Cable - Blue 50pk. Retrieved June 9, 2012, from Cables 2 Go: http://www.cablestogo.com/product.asp?cat%5Fid=3521&sku=31372 • Cisco. (2012). Gigabit Ethernet 1000 Base-T Mini-GBIC SFP Transceiver . Retrieved June 14, 2012, from Cisco: http://cisco.links.channelintelligence.com/pages/prices.asp?sSKU=MGBT1&nRGID=2422 • Cisco Systems. (2012). Cisco 2901 Integrated Services Router. Retrieved June 12, 2012, from Cisco: http://www.cisco.com/en/US/products/ps10539/index.html • Cisco Systems. (2012). Cisco Catalyst WS-C2960S-48TS-L Series Switches (Data Sheet. Retrieved June 10, 2012, from Cisco: http://www.cisco.com/en/US/prod/collateral/switches/ps5718/ps6406/product_data_sheet0900aecd80322c0c.html • PC Rush. (2012). Cisco 2901 ISR; Cisco Catalyst Switch; Cisco HSWIC; APC UPS. Retrieved June 12, 2012, from PC Rush: http://www.pcrush.com • PC Rush. (2012). Cisco High-Speed WAN Interface Card. Retrieved June 11, 2012, from PC Rush: http://www.pcrush.com/product/Network-and-Interface-Modules/767067/Cisco-Ehwic-1-Port-Dual-Mode-SFP-100M-1G-OR-GBE-10M-100M-1G-for-3900

  15. Questions Address questions to Chuck Jansen II chuckamania@chuckamania.net

More Related