1 / 14

LCIA

LCIA. Bram Kale European Engineering manager. OMRON Omron Europe B.V. PLC’s. Vision & ID systems. Human Machine Interface. Timers & Counters. Motion Control (OYMC). Sensors. Card-Readers. OMRON Industrial automation. Japanese multinational 35.000 employees 5.8 Billion in Euro

grazia
Download Presentation

LCIA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LCIA Bram Kale European Engineering manager . OMRON Omron Europe B.V

  2. PLC’s Vision & ID systems Human Machine Interface Timers & Counters Motion Control (OYMC) Sensors Card-Readers OMRONIndustrial automation • Japanese multinational • 35.000 employees • 5.8 Billion in Euro • Industrial automation products

  3. Engineering Process design Product design SMT automated production LCIA assembly Assembly Manual production

  4. LCIA Assembly Description LCIA – Low Cost Intelligent Automation is a system for effective manual production, where manual stages, simple control systems and clever tools are integrated to a flexible, productive and high quality method of assembly.

  5. LCIA assembly Productivity improvement Reduction of Quality problems Increase production Flexibility Focus points:

  6. 7 -Overproduction -Waiting time -Transportation -Processing -Inventory -Motion -Product defect 1. Consequent Elimination of Waste [Muda] 2. Synchronization of Chain of Processes LCIA assembly Drivers of the system Anchor in the line set up

  7. LCIA assembly Balance the strong points of the worker • Flexible • Intelligent • Accurate • Repetitive with those of the machine

  8. Basics of LCIA assembly Productivity Quality Flexibility • Flexible number of operators in line • One-piece flow, fixed # WIP • Standardized labor • Ergonomically sound • everything in a fixed place (5S) • LCIA solutions • Fool-proof (Poka-Yoke) solutions • Efficient work allocation • Teamwork • Paced to (stable) cycle time • Easy & not disturbing material replenishment from outside • Visual management • Flexible number of operators in line • Make many products in one line • Quick change over time • Easy to train operators • Standing style operations Standardized labor Paced to (stable) cycle time Standing style operations Fool-proof (Poka-Yoke) solutions

  9. LCIA effect Productivity Quality Flexibility CQM1 PLC assembly line: Cycle time reduction of 250%

  10. LCIA effect LED allways on Intensity Wrong color No illumination Flexibility Productivity Quality • From: • Manual visual check • Avg 63 customer complaints per year • Estimated >1000 defects per year • To • Low cost vision system • Zero defect & • Inspection time reduction • (20 sec)

  11. LCIA effect Productivity Quality Flexibility 35 different product in one line with change over time <30 sec.

  12. Design process • Line design very early in the product development process • Use Process FMEA to predict possible fault causes • Decide necessary tools based on FMEA level • Detailed Line Design and assembly • Test runs, measure designed cycle times, optimization

  13. Thank you for your attention

More Related