E20 TALLINN - NARVA RECONSTRUCTION MAARDU - VALGEJÕE. MAIN OBJECTIVE. Reconstruction of various road sections to improve the road condition, traffic safety and road environment. MAIN PARAMETERS. pavement - 11,5 m (1 + 2 x 3,75 + 3) embankment - 10 - 12,25 m road - 35,5 - 37,5 m
E N D
MAIN OBJECTIVE Reconstruction of various road sections to improve the road condition, traffic safety and road environment
MAIN PARAMETERS • pavement - 11,5 m (1 + 2 x 3,75 + 3) • embankment - 10 - 12,25 m • road - 35,5 - 37,5 m • central reserve ~ 11 m
TRAFFIC VOLUME 20032020 • Jägala km 26,4 7270 9880 • Kuusalu km 40,3 6040 8640 • Liiapeksi km 52,0 4550 6500
TRAFFIC SAFETY • 2000 - 2003 - 42 traffic accidents • 5 people killed • 59 injured • walking along the road - 13 • collision with animals - 7 • dark time - 54% of the accidents
PAVEMENT CONDITION LAST CONSTRUCTED • Section 1 - 1982 - 1988 • Section 2 - 1962 - 1988 • Section 3 - 1989 - 1990 • Section 4 - 1979 • Section 5 - 1980
PAVEMENT CONDITION IRIrutsdefectsbearing capacity Section 1 4,76 13,4 1 - 5% 345 Section 2 5,99 14,4 2 - 8% 390 Section 3 4,13 13,5 1 - 8% 335 Section 4 5,85 10,5 2 - 5% 315 Section 5 6,51 13,5 3 - 7% 299 Critical value 3,5 - 8 % 230
SCOPE OF MAIN WORKS • Construction of the new payment courses • Improvement of embankments • Improvement of the drainage system • Construction of a new bridge • Renovation of viaducts and bridges • Traffic arrangement and safety measures • Environmental mitigation measures
MAIN INDICATORS • Reconstruction of main road 62,7 km • Earthworks 305 000 m3 • Pavement of main road 820 000 m2 • Pavement of road junctions 98 000 m2 • Renovation of viaducts 7 pcs • Construction of a bridge 1 pcs • Renovation of bridges 5 pcs • Renovation of pedestrian tunnels 2 pcs • Renovation of cattle creep 1 pcs • Safety barriers 30 000 m • Wildlife fence 5 500 m • Road lighting 3 500 m • Culverts and drainage pipes 4 600 m
PAVEMENT CONSTRUCTION Main road • Milling of existing pavement - 4-5 cm • TAB 16 II - 4-5 cm • KMA 12 - 4 cm (8,75) / TAB 12 I - 4 cm (2,75) • Geogrid Road junctions • Milling of existing pavement - 4-5 cm • PAB 16 • TAB 12 I - 4 cm
EARTHWORKS • Widening of embankment (junctions, U-turns) • Reconstruction of embankment - km 26,1 - 30,9 - excavation of unsuitable material - excavation of peat - 11 000 m3 - demolition of concrete slabs - filling of new material - geotextile
DRAINAGE SYSTEM • Cleaning of existing ditches • Excavation of new ditches • Cleaning and repairing of existing drainage system • Construction of new drainage system • Cleaning of existing culverts • Construction of new culverts
RENOVATION OF VIADUCTS AND BRIDGES • Construction of new waterproofing layer • Replacement of expansion joints • Repair of all deteriorated concrete on the bridge (footways) and other exposed surfaces • Replacement of guardrails • Repair of handrails • Reinforcement of slopes • New asphalt concrete layer on bridge deck
JÄGALA II Length - 18 + 2 x 15 m; L = 53,6 m Width - 15,6 m Type - 3-span continuous steel concrete composite bridge
TRAFFIC SAFETY • Improvement of road junctions • Elimination of entrances, U-turns, technologic turns • Improvement of visibility • Renovation of pedestrian tunnels - 2 pcs • Sidewalks - 2,7 km • Guard-rails - 30 km • Road lightning - 3,5 km • Road marking - rumble strips
ENVIRONMENTAL MITIGATION MEASURES • Wildlife passages • Wildlife fence • Wildlife bank tracks • Noise barriers • Warning signs • Hedge • Top soiling and grass seeding • Roadside clearing and crubbing
“Image of elk” on pavement (6m x 1,5m)
Dwellings at the roadside where a noise barrier will be constructed
BUDGET Main works 22 000 000 Supervision 1 100 000 Contingencies 2 200 000 Total25 300 000