60 likes | 177 Views
MOBLAS 7 Timer Test. Howard Donovan NASA SLR HTSI. ILRS Fall Workshop 2005 – Eastbourne, UK. Test Parameters. Aluminum Bar ~8 feet in length Bar fixed to Calibration Pier and Aligned with Beam Path Retro placed on Bar and moved 6 inches each data set
E N D
MOBLAS 7 Timer Test Howard DonovanNASA SLRHTSI ILRS Fall Workshop 2005 – Eastbourne, UK
Test Parameters • Aluminum Bar ~8 feet in length • Bar fixed to Calibration Pier and Aligned with Beam Path • Retro placed on Bar and moved 6 inches each data set • Standard Calibration Test of ~1000 Returns (~5 minutes) • Maintained Receive Energy from Data Set to Data Set • No Changes to Telescope Pointing