ERA legal requirements. Section 40, emergency remedial action (new! April 2006) Conditions before taking action;Existence of a Category 1 hazardImminent risk of serious harm No interim/final management order in forceRemove imminent risk Proper notice requirements must be followed. ERA legal
E N D
1. Emergency remedial action How many Authorities have used ERA?
How many ERA notices have been appealed to the RPT?
2006-2007 There were 76 ERA notices served
To date 7 appeals to the RPT
2. ERA legal requirements Section 40, emergency remedial action (new! April 2006)
Conditions before taking action;
Existence of a Category 1 hazard
Imminent risk of serious harm
No interim/final management order in force
Remove imminent risk
Proper notice requirements must be followed
3. ERA legal requirements Notice requires to be served on all occupiers (can attach to wall)
Within 7 days serve notice and copy notices on interested parties
Appeal provision within 28 days (although be aware of discretion of RPT) (address)
4. ERA case study Case scenario
Four storey semi-detached house divided into five non-self contained flats and one self-contained flat.
Five bedsits sharing bathroom and wc facilities
Five tenants, two of whom were pregnant
5. ERA case study Recent history of problems
Sword incident
Vulnerable occupiers
Harassment/intimidation
Police involvement
Poor management standards
Unplanned renovation work
6. ERA case study Resulting in;
Property left with no electric and water supply
Access required to locked empty flat
7. ERA notice Consider all options available for Category one hazards
Most appropriate course of action
Statement of reasons for decisions
Full HHSRS assessment listing deficiencies
Have regard to enforcement guidance
8. ERA notice Schedule 1
Nature of hazard:-
There is no electrical supply to first and second floor flats and some works have been undertaken and left unfinished. There is no lighting to the flats.
There is no water supply for domestic purposes.
The deficiency giving rise to the hazard:-
Part rewired electrical supply and lack of electrical power to first and second floor flats and no lighting to the flats increases the risk of injury to occupiers. There is inadequate means of heating and cooking. As a result of these deficiencies there is an increased risk of fire.
Lack of an adequate wholesome supply of mains water for drinking, cooking and personal hygiene and sanitation purposes.
9. ERA notice Schedule 2
Nature of remedial action:-
Remedy any/all hazards arising from the electrical installation and for that purpose carry out all necessary works or repair and/or replacement to leave the installation safe and sound.
On completion of electrical works forward to the Council a test and completion certificate provided by a qualified NICEIC registered electrician or the Local Electricity Board.
Reinstate the mains water supply to each of the flats at the premises
10. ERA notice Correct authorisation
Keep accurate record of actions
Clear and easy to use procedures
Standard notices and letters
In house/approved tradesmen
Legal assistance where required, i.e., warrant
Serve notice for recovery of all costs
Make funds available for w-in-d
11. ERA notice Notice served on owner
Two pregnant tenants re-housed immediately
Warrant obtained
Locksmith/plumber and electrical contractor
Oversee works-in-default/certification obtained
On completion tenants moved back into property
Owner invoiced for works-in-default and L.A. costs
12. ERA appeal to RPT Gather and submit all evidence to prosecution standards
Counter appellants information
Brief succinct summary
Witness statements
Submit any costs
Attend property inspection
Represent LA at RPT hearing
(Rehousing costs?)
13. Emergency remedial action appeal For copy of full transcript visit;
http://www.rpts.gov.uk/Indexes/MAN_HA_EMGNO_00FB_2007.htm
Russell Lee 01482 396288
russell.lee@eastriding.gov.uk
14. Emergency remedial action appeal
15. Emergency remedial action