1 / 5

Mission 4c: Intensive Horticulture

Co-operative System. Harvest. Cold Storage. Process. Consumer Market. Package. Banking Finance. www.presidentofindia.nic.in. Mission 4c: Intensive Horticulture. Mushroom Cultivation and processing

gronald
Download Presentation

Mission 4c: Intensive Horticulture

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Co-operative System Harvest Cold Storage Process Consumer Market Package Banking Finance www.presidentofindia.nic.in Mission 4c:Intensive Horticulture • Mushroom Cultivation and processing • HP offers ideal condition for growing the export quality mushroom (Agaricus Bisporusug) • Technology for production and processing has been evolved at Jhakri, Pooh and Sumdo • Non availability of Temperature controlled containers – makes transportation difficult • Inadequate provision for cold storage at the airports- aggravates the situation Mushroom Cultivation, Harvesting, Alternative Process Packaging, Processing and marketing Modern tools helps advance avalanche forecasting. Enabling uninterrupted road links.

  2. Mission 5: Water harvesting and Flood control www.presidentofindia.nic.in 1st layer rain water storage Large Size Layered Water Storage Concept 2nd Layer storage (Excess water from 1st layer) • MISSION OBJECTIVES • Flood control, • Effective utilization • Excess rain water leading • to prosperity and • Employment generation • for local population 3rd Layer storage (Excess water from 2nd layer)

  3. Distribution Loss 2004 2020 25% <5% www.presidentofindia.nic.in Mission 6a: Hydro power Generation India Projection Energy Efficiency is the key Nuclear Thermal Himachal Pradesh < 6000 mw today Pipe line - 3000 mw Hydro CAPACITY BY 2020 Nuclear ~20000 MW Renewable Energy Hydro ~84000 MW HP may plan 10,000 mw Hydro power Station in Mission mode Renewable Energy ~100000 MW Thermal ~96000 MW Total ~300000 MW

  4. 6 MW Power Plant Based Vijayawada, Andhra Pradesh, India Recharging Wells Sustainable - watershed www.presidentofindia.nic.in Mission 6b: Power through Municipal Waste (Experience) 6.6 MW Power Plant Mahaboobnagar, AP • Two power plants with 6 MGW capacities have been established • Based on solid municipal waste technology developed by TIFAC by two entrepreneurs. • This model can be replicated in other municipal and village clusters

  5. www.presidentofindia.nic.in Mission 7: Information Communication Technology E-Governance and ICT Infrastructure establishment Collaborative development and production of high value-added products like cell phones, mobile devices and handheld computers, convergent multimedia devices, PCS • Attract investments in the IT Sector • Facilitating the establishments of IT industries – create an advantage of infrastructure • Improve the quality of IT Education • Provide SMART Governance • Out Sourcing BPO Destination

More Related