An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. 6/14/2012 1 FOSSTON INDUSTRIAL WASTEWATER PRETREATMENT FACILITY Anaerobic Treatment with Biogas Recover

    2. 2 6/14/2012

    3. 3 6/14/2012 Design Flows and Loads

    4. 4 6/14/2012 Actual Loads Treated

    5. 5 6/14/2012 Historical Flows Treated

    6. 6 6/14/2012 Operating Temp 04/05

    7. 7 6/14/2012 Biogas May 2005

    8. 8 6/14/2012 Pilot Report Estimate

    9. 9 6/14/2012 Total Flows 2004/2005

    10. 10 6/14/2012 Energy Balance

    11. 11 6/14/2012 Treatment Costs

    12. 12 6/14/2012 Biogas Produced in 2006 Prior to an early shut down in January the Pretreatment facility was producing over 200 cfm of 70% methane biogas.