Front End Studies International Design Study & Muon Collider. David Neuffer December 2009. Outline. Front End for the Neutrino Factory/MC Concepts developed during study 2A Concern on V rf ’ as function of B sol ~200MHz, 10+ MV/m B= ~2T Variations Need baseline design for IDS

guang
Download Presentation

Front End Studies International Design Study & Muon Collider

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Front End StudiesInternational Design Study &Muon Collider David Neuffer December 2009

  2. Outline • Front End for the Neutrino Factory/MC • Concepts developed during study 2A • Concern on Vrf’ as function of Bsol • ~200MHz, 10+ MV/m B= ~2T • Variations • Need baseline design for IDS • need baseline for engineering study • updated version to match IDS • ~lower fields; medium bunch length

  3. Plan for IDS • Need one design likely to work for Vrf/B-field • rf studies are likely to be inconclusive • B=1.25T; V’ = 10MV/m is very likely to work • B= 2T; V’ = 15 MV/m should work with Be • Hold review to endorse a potential design for IDS • – likely to be acceptable (Vrf/B-field) • April 2010 ? • Use reviewed design as basis for IDS engineering study

  4. Potential strategies: Use lower fields (V’, B) 10MV/m at 1.5T? Use non-B = constant lattices alternating solenoid Magnetically insulated cavities Is it really better ??? Alternating solenoid is similar to magnetically insulated lattice Shielded rf lattices low B-field throughout rf Use gas-filled rf cavities same gradient with/without fields but electron effects? Use Be Cavities should have better B/ V’rf Solutions for possible rf cavity limitations

  5. Shielded rf cooling channel (C. Rogers) • Lattice that keeps B small within rf cavities • Iron placed around coils • B < 0.25T at rf • Problems • rf occupancy ~1/3 • larger β* (~1m) • tranverse acceptance • Still has fair cooling • increases μ/p by 1.7 3m rf cavity

  6. Baseline IDS candidate p π→μ FE Target Solenoid Drift Buncher Rotator Cooler 10 m ~50 m ~32m 36m up to ~100m m • ISS study based on nB = 18 ( 280 MeV/c to 154 MeV/c) • 1.75T, 12MV/m • Reference -shorter has nB = 10 ( 280 MeV/c to 154 MeV/c) • slightly higher fields (2T, 15MV/m) • Looking for candidate variation for IDS • developing intermediate case, with a bit weaker fields

  7. Recent Studies on Lower Fields • Adequate acceptance can be obtained by reducing magnetic fields and gradients • B -> 1.25T, V’ -> 10 MV/m ?? • (10MV/m is 7MV/m real estate gradient; could use 7MV/m if space is filled.) • Reduced B, V’ are relatively certain to work. • Cost optimum? • B=1.5T ?, 12MV/m 0.75T, 14MV/m

  8. Look at performance if V’rf is reduced • Muons per 10 8-GeV protons B=2T (B=1.25T ~5% worse) - B= 1.5T ~5% better Variation is not strong; more rf still means more muons

  9. Front End ReOptimization p π→μ FE Target Solenoid Drift Buncher Rotator Cooler 18.9 m ~60.7 m ~33m 42m up to ~100m m • Change reference B-field to 1.5T • constant B to end of rotator • Redoing nB =“12” example • A bit longer than nB = 10 • optimize with lower fields • V’rf < 12 MV/m • Will see if we can get “better” optimum

  10. High-frequency Buncher and φ-E Rotator p π→μ FE Target Solenoid Drift Buncher Rotator Cooler 18.9 m ~60.7 m ~33m 42 m ~80 m • Drift (π→μ) • “Adiabatically” bunch beam first (weak 320 to 232 MHz rf) • Φ-E rotate bunches – align bunches to ~equal P (233MeV/c) • 232 to 202 MHz, 12MV/m • Cool beam201.25MHz

  11. Parameters of candidate release • Initial drift from target to buncher is 79.6m • 18.9m (adiabatic ~20T to ~1.5T solenoid) • 60.7m (1.5T solenoid) • Buncher rf – 33m • 320  232 MHz • 0  9 MV/m (2/3 occupancy) • B=1.5T • Rotator rf -42m • 232  202 MHz • 12 MV/m (2/3 occupancy) • B=1.5T • Cooler (50 to 90m) • ASOL lattice, P0 = 232MeV/c, • Baseline has 15MV/m, 2 1.1 cm LiH absorbers /cell 0.08 μ/p cooling 0.00

  12. progression through system z =1m 80m 156m 215m 112m

  13. NF Release Candidate • Front End a bit longer than “short” example • ~50m shorter than ISS, however • gradients no greater than ISS baseline • slightly better “performance” 66m bunch window

  14. How Long a Bunch Train for IDS? • ISS study alotted space for 80 bunches (120m long train) • 80m or 54 bunches is probably plenty Study 2A ~80m -20 100 nB =10 ~50m 40 -30

  15. Bunch train length • Within IDS design could reduce bunch train to ~80m (52 bunches) • very little mu loss • With shorter front end, could reduce that to 50m or less • For Collider scenario ~12 best bunches, (18m) contains ~70% of muons • Reserving80m for bunch trains should be adequate for IDS Study 2A 20m

  16. B0 = 1.5T, nB = 12 RC • Muons per 10 8-GeV protons (At< 0.03, AL<0.02) Black are old nB = 10 example; new version is Green

  17. Varying Buncher/Rotator Voltage • Vary buncher/rotator gradients from baseline to explore sensitivity to gradient limits. • same baseline cooling channel (16MV/m, 1.15cm LiH) • 15 MV/m -> 1.1cm Li H • Somewhat less sensitive than previous

  18. rf requirements • Buncher • 319.63, 305.56, 293.93,285.46, 278.59, 272.05, 265.80, 259.83, 254.13, 248.67, 243.44, 238.42, 233.61 (13 f) • ~100MV total • Rotator • 230.19, 226.13, 222.59, 219.48, 216.76, 214.37,212.28, 210.46,208.64, 206.90, 205.49,204.25, 203.26, 202.63,202.33 (15 f) • 336MV total • Cooler • 201.25MHz –up to 75m ~750MV

  19. Plans etc. • Move toward “realistic” configuration • More realistic B-field • B= 1.5T -> coil-based fields • add Be windows • smaller number of rf frequencies • Set up design for cost algorithm • rf cavity design (pillbox, dielectric) • rf power requirements • Magnet design • Continuing front end IDS design study • C. Rogers, G. Prior, D. Neuffer, C. Yoshikawa, K. Yonehara, Y. Alexahin, M. Popovic, Y. Torun, S. Brooks, S. Berg, J. Gallardo … • Fermilab meeting (July) • ~Biweekly phone Conference • Meeting at RAL • December 14-18 • April at Fermilab (IDS meeting) dielectric

  20. IDS - cost issues …

  21. Study2B June 2004 scenario (ISS) • Drift –110.7m • Bunch -51m • 12 rf freq., 110MV • 330 MHz  230MHz • -E Rotate – 54m –(416MV total) • 15 rf freq. 230 202 MHz • P1=280 , P2=154NV = 18.032 • Match and cool (80m) • 0.75 m cells, 0.02m LiH • Captures both μ+ and μ- • ~0.2μ/(24 GeV p)