UX85 – PZ Area (1). PROGRESS. Boring holes for cabling TFO to EXD cabinets PZ Area (RB84 Side). 16 March 2005. FIG. 1. UX85 – PZ Area (2). Boring holes for cabling TFO to EXD cabinets PZ Area (RB84 side). 16 March 2005. FIG. 2. UX85 – PZ Area (3). 16 March 2005.
E N D
UX85 – PZ Area (1) PROGRESS Boring holes for cabling TFO to EXD cabinets PZ Area (RB84 Side) 16 March 2005 FIG. 1 D.LACARRERE
UX85 – PZ Area (2) Boring holes for cabling TFO to EXD cabinets PZ Area (RB84 side) 16 March 2005 FIG. 2 D.LACARRERE
UX85 – PZ Area (3) 16 March 2005 Apertures for cabling PZ Area (RB84 side) 16 March 2005 FIG. 3 D.LACARRERE
UX85 – PZ Area (4) 18 kV cables 18 kV cables from US85 area to PZ area Achieved (J. Pierlot) 16 March 2005 FIG. 4 D.LACARRERE