An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISQM 410 – Project Management Chapter 3 – Organization: Structure & Culture

  2. PM Structures • PM structures • Functional organization – traditional “stovepipe” • Advantages: • Project completed within existing organization structure,; no alteration of operations • Maximum flexibility in use of staff • If scope narrow, in-depth expertise can of functional unit can be applied • Normal career paths are within functional divisions are maintained • Disadvantages • Project often lack focus and commitment • Poor integration across functional units • Generally takes longer to complete • Motivation of team members often limited

  3. PM Structures • PM structures • Dedicated project teams – operate separately from rest of the parent organizations • Advantages: • Relatively simple way to complete projects; does not disrupt ongoing operations • Get done more quickly • High level of motivation and dedication • High level of cross-functional integration (if staffed properly) • Disadvantages: • Expensive; loss of economies of scale • Projectitis – we-they divisiveness • Inhibits maximization of technological expertise • What to do with personnel when project is complete

  4. PM Structures • PM structures • Matrix management – hybrid that overlays PM structure on functional hierarchy (can have functional, balanced, or project matrix) • Advantages: • Share resources (more cost efficient) • Stronger project focus by having assigned PM • Access to larger reservoir of talent (homeport return helps with economies of scale & technological expertise) • More flexible utilization of resources • Disadvantages: • Tensions between PMs and functional organizations can breed conflicts (need to be managed) • Resource sharing can lead to conflict/competition • Violates unity of command (two bosses) • Decision making can get bogged down

  5. PM Structures • Organization: Structure & Culture • Factors in PM Structure Selection • Size of project • Strategic importance • Novelty & the need for innovation • Need for integration (number of departments) • Environmental complexity (external interfaces) • Budget & time constraints • Stability of resource requirements • *** Higher the levels of these seven factors, the more autonomy & authority the PM & team require >> matrix or dedicated teams are preferred

  6. PM Structures • Organization: Structure & Culture • Characteristics of organizational culture and their relationship to PM • Member identity – job vs. organization • Team emphasis – individual vs. group • Management focus – task vs. people • Unit integration – independent vs. interdependent • Control – loose vs. tight • Risk tolerance – low vs. high • Reward criteria – performance vs. other • Conflict tolerance – low vs. high • Means-end orientation – means vs. ends • Open-system focus – internal vs. external

  7. PM Structures • Identifying Cultural Characteristics • Involves synthesizing the following: • What people tell you – content and how is it communicated • How they act – is behavior consistent with words • Individual & organizational responses to events • Physical environment – dress code; how is position & status identified and perceived; locus of power • Business environment – what issues are important (explicit vs. implicit); financial vs. people • How people interact – slow & methodical vs. urgent & spontaneous; rituals; values; level of candor: who talks & how. • Critical in being able to adapt and contribute to the organization. • Personal – cultural fit is critical to success (person & organization)

  8. PM Structures • Implications of Organizational Culture for Organizing Projects • Cultural dimensions must be optimized for effective project management • Some dimensions require balance (middle-of the-road) > task/people focus; ends/means focus • Other dimensions require more emphasis on one end of the continuum > Focus on external environment; greater interdependence & group focus (required for effective teaming); greater risk tolerance; greater conflict tolerance • Greater project authority/resources necessary in orgs. That have strong, negative cultural currents • Less formal authority & fewer dedicated resources needed in orgs. Where cooperation and interdependence have a strong cultural presence • Must be interpreted in the context of business environment, systems, and processes (capability)