460 likes | 560 Views
Gasngo Delivering Fuel Control. Gasngo AVI System Basic Technical Training. Class Goals: Familiarizing with system components and technician tools Understanding installation procedures Acquiring marketing oriented technical information Duration: 240 minutes (divided into 3 parts)
E N D
Gasngo AVI System Basic Technical Training • Class Goals: • Familiarizing with system components and technician tools • Understanding installationprocedures • Acquiring marketing oriented technical information • Duration: 240 minutes (divided into 3 parts) • Target audience: Sales and marketing teams
Pre-market Pilot • Integration with controller • Lab testing • Definition of pilot • Site Survey • Pilot installation (OTJ – ASR) • Pilot conclusion and acceptance • Plan rollout • Multi-Station deployment • Vehicle installation (Client or ASR) • ASR start up and registration
VDD types The basic VDD – for counting mileage The Engine hours VDD The OBD VDD
Gasngo Tag • Tag is pre programmed • Contains confidential information • Is encrypted • Stops working when removed from vehicle • Major aims for installation: • Optimal read proximity • Self destructing
Information on the Tag Tag info - confirmed by customer AC
Summary – Vehicle Installation Required for Vehicle Installation: • Tags • VDDs • Adapters • Technician tools • PC / Laptop • GPTC • Reader Buzz Service point Trained technician Trained technician
Station Installation - Checklist Survey the station. Determine optimal GSC location. Set up infrastructures. Set up anchorage point. Assemble GSC. Plug in battery, install each Reader. Install GPC on PC. Configure station hardware and settings. Refuel to test system configuration.
Infrastructure Requirements • Infrastructure - critical for system function • Network • Power
GSC Position On station ceiling On pole Directionality and range – critical!
Finalizing Station Installation Test installation – follow procedure: Readers GSC Coverage
Summary –Station Installation Required for Station Installation: Installation time • Readers • Insulators • GSC • GSC Arm • GSC SW • Technician tools Station PC Trained technician Trained technician
Additional Features Log reporter settings Connecting from a remote PC
Rollout process summary • Tags • VDDs • Adapters • Technician tools • PC • GPTC • Buzz Reader Vehicle Station Service point Service point Trained technician • Readers • Insulators • GPC • GSC • GSC Arm • Technician tools GSC-PC Trained technician