1 / 2

MGPA Status Layout finished, checked, & transmitted to CERN die size: 4mm x 4mm

MGPA Status Layout finished, checked, & transmitted to CERN die size: 4mm x 4mm Target package: 100 pin QFP - 14mm x 14mm - 0.5mm pin pitch - 1.8 mm package height above board surface. Action list following design review (Jan 13 th ) (priority order)

gusty
Download Presentation

MGPA Status Layout finished, checked, & transmitted to CERN die size: 4mm x 4mm

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MGPA Status Layout finished, checked, & transmitted to CERN die size: 4mm x 4mm Target package: 100 pin QFP - 14mm x 14mm - 0.5mm pin pitch - 1.8 mm package height above board surface MGPA Status

  2. Action list following design review (Jan 13th) (priority order) • Investigate and improve Power Supply Rejection: • - see note http://www.hep.ph.ic.ac.uk/~dmray/pdffiles/MGPA_PSR.pdf • Quantify timewalk of pulse peak dependence on process spread • - pk-pk variation ~ 3ns, more detailed note in preparation • MGPA O/P: ADC I/P simulation • - some work begun but more needed • Further study of transmission line effects between APD/VPT and MGPA • - observed ringing at charge amp O/P depends on characteristics of unterminated transmission line • (length, impedance, APD/VPT capacitance), not on MGPA • - detailed dimensions of flexible APD/MGPA interconnect would be useful • Gate test pulse control input with bit from I2C general purpose register -> done • Provide details of pulse shape on falling edge of saturated channels • - any problem here fixed by hysteresis introduced in range change following ADC • Preliminary testing plans (at Imperial) • Electrical performance: MGPA in isolation • - look at details of linearity, pulse shape matching, noise • - quantify consistency with simulated performance • Test setup needs development • (14 bit, 100 MHz VME ADC will be available) MGPA Status