LHCb FEE LNF status. Overview. Muon Meeting - LNF 12/13 Feb 04. OPB SPB IB ODE Crate backplane FEE LV System Layout FC FEE LV On-Chamber Layout. OPB. Muon Meeting - LNF 12/13 Feb 04. PCB Layout OK Prototypes OK SCRO production Red type (long pins) 2000
E N D
Overview Muon Meeting - LNF 12/13 Feb 04 • OPB • SPB • IB • ODE • Crate backplane • FEE LV System Layout • FC • FEE LV On-Chamber Layout
OPB Muon Meeting - LNF 12/13 Feb 04 • PCBLayout OK • Prototypes OK • SCRO production • Red type (long pins) 2000 • Yellow type (short pins) 1300 • Components delivery April 04 • Assembling & test June 04 • DCRO • Blue 150 • PCB delivery March (1° week)
OPB Muon Meeting - LNF 12/13 Feb 04 • SCRO PCB 0,53 € • DCRO PCB 3,20 € • Connectors (long-single row-19 contacts) 0,50 € • Cod. 801-91-019-10-005 • Connectors (short-single row-19 contacts) 0,33 € • Cod. 801-91-019-10-12 • Assembling & test 0,50 €
Muon Meeting - LNF 12/13 Feb 04 SPB • PCBLayout OK • Potenza (Donato) is in charge for SPB production
Muon Meeting - LNF 12/13 Feb 04 IB & TB • IB PCBLayout OK • TB PCB Layout OK • TB rel. 2 (increased number of outputs) • Test March 04 • Production (connectors delivery time) June 04 • IB rel. 2 (ACTEL configuration) • Test February 04 • IB Components Qualification Summer 04 • IB Production (start) December 04
Muon Meeting - LNF 12/13 Feb 04 ODE • PCBLayout rel. 2 February • QPLL • HFBR772BP • ACTEL PROASIC • TTCRX Optical Receiver • PCB delivery March • Assembling April • Test May
Muon Meeting - LNF 12/13 Feb 04 Crate backplane • PCBLayout rel. 2 March • TTCRX new optical receiver requires +5 V • PCB delivery April • Assembling May • Test June
Muon Meeting - LNF 12/13 Feb 04 FEE LV System Layout – Current requirements 430 ma
Muon Meeting - LNF 12/13 Feb 04 FEE LV System Layout – 3 A modularity scenario
Muon Meeting - LNF 12/13 Feb 04 FEE LV System Layout – CAEN solution System Layout Available modules
Muon Meeting - LNF 12/13 Feb 04 FEE LV System Layout – WIENER solution System Layout Available modules
Muon Meeting - LNF 12/13 Feb 04 FEE LV System Layout – Modules & Crates - CAEN
Muon Meeting - LNF 12/13 Feb 04 FEE LV System Layout – Modules & Crates - WIENER
Muon Meeting - LNF 12/13 Feb 04 FC • FC design • HV connector not defined • Wait for FEB to produce FC proto ?
Muon Meeting - LNF 12/13 Feb 04 FEE LV on-chamber layout – M3R3