District Heating. Typical range of power 500 kWth – 20 MWth Optimum size about 1 MWth Consumption about 1.000 tons/year compatible with local availability Reduced impact Repeatability Contained costs. Boiler. Chips cost 40 – 60 Euro/tons Heat cost 6 - 8 cEuro/kWh. District heating pipe.

gwen
Download Presentation

District Heating

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. District Heating • Typical range of power 500 kWth – 20 MWth Optimum size about 1 MWth • Consumption about 1.000 tons/year compatible with local availability • Reduced impact • Repeatability • Contained costs Boiler Chips cost 40 – 60 Euro/tons Heat cost 6 - 8 cEuro/kWh District heating pipe

  2. CHP Combined production of Electric and Thermal power from biomass Technologies • Steam (classical Rankine Cycle) Power range 5 MWe  20 MWe Annual use of wood higher than 50.000 tons/year Efficiency about 15-25% • Organic Rankine Cycle Power range 450 kWe  1.5 MWe Annual use of wood from 5.000 to 15.000 tons/year Efficiency about 15% • Green Certificate • To improve the production of electricity from renewable energy source  GREEN CERTIFICATES (about 10 c€ per kWh) ORC Turbogenerator

  3. Pellets boiler – Typical installations • 8-10 kWth • Domestic heating • Production of hot air • Consumption: 0,6 – 2,1 Kg/h • Cost: 2.000 – 4.000 Euro • 25 kWth • Small houses • Production of hot water and hot air • Consumption about 5 kg/h • Cost 5.000 – 10.000 Euro • 110 kWth • Buildings • Production of hot water • Consumption about 20 kg/h • 35.000 – 50.000 Euro • It needs place to store Pellets boiler

  4. E. Logistic systems • Chainsaw • Transportation system with mobile engine • Timberjack (less used) • Tractors (in most of cases) SUPPLY CHAIN

  5. Supply chain - 1 Cut off using chainsaw Transportation with tractor Measurement and section

  6. Supply chain - 2 Transportation system with mobile engine Transportation with track trailer Heavy mobile chips machine Truck loading

  7. Next deliverables (short term) • List of regional stakeholder • Analysis of wood resources and energy • Demand Catalogue of technologies and logistic systems

  8. Proposals for next deliverables • Common template for deliverables • Set deadlines for deliverables • Next study tour: where ? when ? focus on: technologies ? Logistic systems ?