THYSSENKRUPP ELEVATOR ELEVATOR MODERNIZATION PROJECT 450 N STREET
THYSSENKRUPP ELEVATOR • 3RD LARGEST ELEVATOR COMPANY IN WORLD - LARGEST IN NORTH AMERICA • DIVISION OF THYSSENKRUPP AG – FORTUNE “GLOBAL 100” COMPANY • LARGEST ELEVATOR SERVICE COMPANY IN SACRAMENTO • SOLD MORE MODERNIZATION IN SAC THAN ANY OTHER COMPANY
State Capitol Office Building 8 (714 P St.) 3) Office Building 10 (721 Capitol Mall) 4) Legislative Office Building (1020 N St.) 5) Resources Building (1416 9th St.) 6) Office Building 9 (744 P St. - Finishing now) 7) EDD Building (722/800 C.M. - In progress now) MODERNIZATION PROJECTS – STATE BUILDINGS DOWNTOWN
New, state-of-the-art, microprocessor controls. Generators will be removed and new AC hoist motors installed New digital tape landing system Rope-Gripper (ascending safety device), per 2004 Code All new hoistway and machine room wiring New, closed loop door operators New seismic switch New car and hall stations to comply with ADA and current F.S. Code New hall lanterns, hall position indicators, and lobby panel New electronic door edges Load weighing Voice annunciators SCOPE OF WORK
New controls/system good for the next thirty (30) years Leveling accuracy exact – under all load conditions (digital feedback) Less wait time for elevators (dispatching & positioning) Power savings (elimination of generator) Enhanced safety (digital feedback and back-up safety circuitry) Less equipment downtime for repairs (all new equipment) Updated to current ADA and Fire Service Code Added door safety (electronic door edge) More efficient trips (load weighing) Modern look and feel (new fixtures and voice floor announcements) BENEFITS OF MODERNIZATION
START = EARLY APRIL, 2010 One low rise and one high rise at same time Once complete: inspect, turn on, begin next pair Approximately 12 - 14 weeks per pair Overall Project Duration = 18 – 24 months SCHEDULE