An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wisconsin Weatherization Program • Funding and Production- • $8.6 million DOE, $18.9 million LIHEAP Transfer, $46.3 million State Public Benefits = $73.8 million • 21 Local Agencies • SFY 09 8,665 Unit Goal • $7,300 Projected Average Unit Cost NASCSP Conference Barb Klug-Sieja

  2. Wisconsin Quality Assurance Program • Quality Assurance Program- • 3 State Quality Assurance Monitors • 1 State Administrative Monitor • Wisconsin Energy Conservation Corp. 2 Staff Dedicated to Quality Assurance NASCSP Conference Barb Klug-Sieja

  3. Wisconsin Quality Assurance Program • Inspections • 5% Production-Over 400 On-Site Inspections • 3 Agency Visits Per Year • Annual Administrative Review Per Agency NASCSP Conference Barb Klug-Sieja

  4. Wisconsin Quality Assurance Program • Contract for Inspection Services- • Insufficient State Staff, Hiring Freezes • Request For Bid Process • Quality Assurance, Training &Technical Assistance, Fiscal and Policy Staff Input • Posted on VendorNet and Circulated Through Out the Weatherization Network • One Year Contract Period, With Two One Year Extensions Possible NASCSP Conference Barb Klug-Sieja

  5. Wisconsin Quality Assurance Program • Request for Bid - General Technical Requirements Work Plan, Experience Providing Inspection Services, Resume of Inspectors, List of Required Equipment, Insurance NASCSP Conference Barb Klug-Sieja

  6. Wisconsin Quality Assurance Program • Request for Bid (Continued) • Technical Specifications- • Weatherization Measures Meet Specifications • Materials and Appliances are Present • Two Weeks Notice Prior to On Site Inspection • Deliverables • 200 On-Site Inspections ($625 ea) • 100 Emergency Furnace Inspections ($465 ea) NASCSP Conference Barb Klug-Sieja

  7. Wisconsin Quality Assurance Program • Inspection Reporting • Outlined in RFB • Quality Assurance Unit Picker and Database • Measures Installed and Findings Reported • WECC sends reports to QA Section Chief • State sends letters to agencies listing findings NASCSP Conference Barb Klug-Sieja

  8. Wisconsin Quality Assurance Program • WX Ramp Up- • Currently 8,665 Units – 4 to 5 FTE • Estimated 20,000 Units- Estimate 8+ FTE • Critical Partnership Between Inspection Sub Contractor and the Division of Energy Services. NASCSP Conference Barb Klug-Sieja

  9. Links and Contacts • Barb Klug-Sieja Division of Energy ServicesP. O. Box 7868 Madison WI  53707-7868 • 608-267-0227Fax 608-267-6931 barbara.klugsieja@wisconsin.gov • http://homeenergyplus.wi.gov/ NASCSP Conference Barb Klug-Sieja