130 likes | 219 Views
Market design as crossroads of the energy turnaround in Europe. Žofinské fórum Prague. Lex Hartman, Member of the Board, TenneT TSO 30.09.2014. TenneT. Energy for the Netherlands , Germany and Europe. Europe’s first cross-border TSO
E N D
Market design as crossroads of the energy turnaround in Europe ŽofinskéfórumPrague Lex Hartman, Member of the Board, TenneT TSO 30.09.2014
TenneT EnergyfortheNetherlands, Germany and Europe • Europe’s first cross-border TSO • Connections to 10 TSOs – in the centre of the European electricity market • Total grid length of ~ 20,900 km (110 - 380 kV) • Amongthe top 5 TSOs in Europe Market design as crossroads of the energy turnaround in Europe
CurrentChallenges • Infrastructure • Griddevelopment • System stability • Bottlenecks • EnergyOnlyMarkt (EOM) • Decreasingmarketprices • ofincentivestoinvest in power plants • Integration of RES • Imprecise Prognosis • Volatility • Subsidies & CostsforSociety • Europe • Divergingandincoherentenergypolicies in Member States Market design as crossroads of the energy turnaround in Europe
Our Proposal RES Market Integration StrengtheningtheEnergyOnly Market Safety Net European Coordination Grid Development Market design as crossroads of the energy turnaround in Europe
Europe Common targets (20/20/20) but incoherent policies among Member States Feed-in Different Support Schemes Premium Green Certificates BiddingProcesses Sonstige Capacity Mechanisms Strategic Reserves Capacitymarkets Capacitypayments Non specified but exist Quelle:ENTSO-E Survey If we still want to have a true Internal Energy Market, then national energy policies must be compatible across Europe Market design as crossroads of the energy turnaround in Europe
The solution?Gridexpansionforeverybody … Market design as crossroads of the energy turnaround in Europe
The Essence The availabilityofournetworkis 99,9999 %
Onshore Thanksforyourattention. Wilkommensveranstaltung TenneT TSO GmbH Lex Hartman, Mitglied der Geschäftsführung 02.07.2014
Energy Only Markt (EOM) • Minimizeinterventions in themarketandtheformationofprices • RES must becomecompletelyintegratedmarketparticipantsand must providebalancingservices • Keep the EOM • Allocatecosts in a consequentmanner, provideincentives • Accepttheconsequences
Europe • Synchronisation ofpoliticalmeasuresin ordertoachievecommontargets • Cross-bordercooperationto handle supplybottlenecks • Speedyrealisationofinterconnectors • Agreement among all marketparticipantsregardingjointtargetsfor RES feed-inandthetechnicalfeasability
Infrastructure IIGridexpansion in anotherdimension Gridexpansionfor TenneT D:„missionimpossible“? ~2500 km Factor100 ~25 km 2003-2012 2013-2023
The Future Grid • A Structural Change in Energy Supply • … „transportandconsumption follow production“ • The structureofenergysupplyischanging… from „productionfollowsconsumption“ to …