230 likes | 474 Views
STANDARD FQP. By D NIKHANDIA Mgr. POWERGRID. 1. DETAILED SURVEY. A. ROUTE ALIGNMEN. B. Route profiling & tower spotting. A. TOWER LOC. & FINAL LENGTH. CHECK SURVEY. DETAILED SOIL INV. A. BORELOG. B. TEST ON SAMPLES. 2.TOWER FOUNDATION. A.MATERIALS Cement. ii) Reinforcement steel.
E N D
STANDARD FQP By D NIKHANDIA Mgr. POWERGRID
1. DETAILED SURVEY • A. ROUTE ALIGNMEN
A. TOWER LOC. & FINAL LENGTH CHECK SURVEY
DETAILED SOIL INV. A. BORELOG
2.TOWER FOUNDATION • A.MATERIALS • Cement
C. CONCRETE WORK • i) Before concreting
3. TOWER ERECTION • Materials
4. STRINGING • A. Materials • Insulators
5. AFTER SRINGING Conductor and E/W