Absorber Integration Issues. Shigeru Ishimoto KEK. MICE CM21, Jun-06, 2008, Daresbury Lab., England. OUTLINE. 1) MICE Absorber Design by KEK & MIRAPRO 2) MICE Test Cryostat at KEK 3) Instrumentation 4) Grant-in-Aid Fund 5) Absorber Schedule 6) Summary and Plan. AFC Module with
E N D
Absorber Integration Issues Shigeru Ishimoto KEK MICE CM21, Jun-06, 2008, Daresbury Lab., England
OUTLINE 1) MICE Absorber Design by KEK & MIRAPRO 2) MICE Test Cryostat at KEK 3) Instrumentation 4) Grant-in-Aid Fund 5) Absorber Schedule 6) Summary and Plan
AFC Module with MICE Absorber Mini-Flanges (In-Seal) G10 Supports LH2 IN 30 Pin Feedthrough
MICE Test Absorber MLI wrapped MLI --- 1 layer Al-Mylar 9m x5 + Polyester Mesh x6 Window 1 layer Body 4 layers
H2 gas tank (2000 l) Cryocooler Bendix 18 pin connector x2 TMP H2 press.transducer Top view of test cryostat
KEK Design He/N2 OUT G-H2 OUT Tee L-H2 IN He/N2 IN 30 Pin Feedthrough
MICE Absorber Design by MIRAPRO Hole for Heater 2 Holes for Heaters
Support Flange for Pipe Welding
Detail of Flange and G-10 Support G-10 (x8) t=1, W=25, L=90 mm Total ~ 0.2 W 34 SS f15.7 6.5 7 SS, t=1 34 Screws on AFC Magnet AL f14.8 From Absorber
Grant-in-Aid Fund for MICE The MICE-Japan group have received funding for MICE of a few 100k euro for 3 years (from 2008 to 2010). We will contribute to MICE more than ever and will be able to construct LH2 absorbers and others. - Yoshi KUNO - Yoshitaka Kuno Osaka Leader of JICE-Japan Makoto Yoshida Osaka SciFi Akira Sato Osaka DAQ, Trigger Yasushi Arimoto Osaka Beam Monitor Koji Yoshimura KEK VLPC, Detector Shigeru Ishimoto KEK LH Absorber 2 LH Absorber in FY2008 1 LH Absorber body in FY2009
Aspirational MICE Schedule m STEP I Febuary-May 2008 ? STEP II June 2008 STEP III.1 December 2008 STEP IV Delivery of 1st FC Oct 2009 STEP V Spring 2010 STEP VI Q4 2010 -- 2011
MICE Absorber Schedule STEP V STEP IV STEP VI Spring 2010 Delivery of 1st FC Oct 2009 Q4 2010 -- 2011 CM21 Comments *Monpower at KEK & RAL *Needs colaboration with US group Information of window flange, LakeShore parts
Summary and Plan 1) MICE Absorber Design by KEK & MIRAPRO - Design and Cost Estimation are finalizing - Information of Real windows is missing 2) MICE Test Cryostat at KEK - Ready for test MICE absorber 3) Instrumentation - Almost finalized, needs thermometer block design 4) Grant-in-Aid Fund - a few 100k euro for 3 years (from 2008 to 2010) 5) Absorber Schedule - manpower at KEK & RAL