Absorber Home works. RIKEN/RBRC Itaru Nakagawa. Machining. B-Field Measurement. probe. Before machining. probe. After machining. D d =0.1mm Pitch. D r =0.1mm Pitch. B=500Gauss. B=500Gauss. Measured Results. Material (SUS310) Supplier.

hop
Download Presentation

Absorber Home works

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Absorber Home works RIKEN/RBRC Itaru Nakagawa

  2. Machining

  3. B-Field Measurement probe Before machining probe After machining Dd=0.1mm Pitch Dr=0.1mm Pitch B=500Gauss B=500Gauss

  4. Measured Results

  5. Material (SUS310) Supplier Very likely no stock available. Need to produce. Production ~ 1 week. Waiting > 7 weeks.

  6. Summary for Both Arms Yagishita has only 2 machine centers, while TIME has 5.

  7. SUS304 • 50tmm? Plates are in stock. Confirmed for one arm amount by Inoue Material. They can get plates within 2 weeks.

  8. Budget Transfer Issue

  9. Scenario 1 RIKEN BNL UIUC $250k $100k $50k Can BNL/UIUC issue a purchase order to REPIC w/o bidding? Bid REPIC REPIC Absorber Project Company A Company B Material ~$300k Machining ~$50k

  10. Scenario 2 RIKEN BNL UIUC $250k $100k $50k RIKEN Administration Bid Absorber Project Company A Project C Company B Project B Material ~$300k Machining ~$50k

  11. Scenario 3 RIKEN BNL UIUC $250k $100k $50k Bid Absorber Project Company A Company B Material ~$300k Machining ~$50k

  12. Construction in US

  13. Scenario 1 BNL UIUC RIKEN $50k $250k $100k South arm Bid North arm Bid Bid in Japan Company B REPIC