360 likes | 526 Views
Information Systems Security. Business Continuity Planning Domain #6. Pieces of the BCP. Disaster Recovery Planning How to survive the disaster Emergency response responsibilities Recovery procedures Business Continuity Planning How to stay in business crippled
E N D
Information Systems Security Business Continuity Planning Domain #6
Pieces of the BCP • Disaster Recovery Planning • How to survive the disaster • Emergency response responsibilities • Recovery procedures • Business Continuity Planning • How to stay in business crippled • Continuity of critical business functions • Reduce overall impact of interruption
Processes of the BCP Plan • Project Initiation Phase • Current State Assessment Phase • Design and Development Phase • Implementation Phase • Management Phase • REPEAT, REPEAT, REPEAT
Project Initiation • Gain support of management • Show cost versus benefit • Regulatory requirements • Ramifications of others not having a plan • Current vulnerability analysis
Current State Assessment • Threat Analysis • Business Impact Assessment • Continuity Planning Process Assessment • Benchmark or Peer Review
Design and Development • Develop appropriate continuity strategy • Develop crisis management plan • Develop infrastructure • Design initial acceptance testing • Plan for resource acquisition
Implementation • Deploy continuity plan • Perform short-term and long-term testing • Program maintenance • Program training and awareness • Program management process
Senior Management’s Role • Due diligence and due care • Drive all phases of the plan • Consistent support and final approval • Ensure that testing takes place • Constructing a budget
BCP Team • Minimum key personnel should be: • Member of each key department • Member of support staff • IT reps • Security reps • Legal reps • Senior management
BCP Committee • Carries out risk assessment and analysis • Analysis to be carried out before plan is developed • Execute • Business impact analysis • Development plan • Testing and plan maintenance
Risk Assessment • ID critical business functions • ID resources these functions depend upon • Calculate life expectancy w/o resources • ID vulnerabilities and threats to these functions • Calculate risks to these functions • Develop backup plans for these functions • Develop recovery plans for these functions
Types of Analyses • Quantitative • Involves the use of numbers and formulas to reach a decision • Qualitative • Involves the use of non-numerical factors such as emotions, confidence, workforce stability, and other concerns into account
Identify Priorities • Activities that are most essential to your day-to-day operations • Maximum Tolerable Downtime (MTD) • Maximum length of time a business function can be inoperable without causing irreparable harm to the business
Identify Business Risks • Natural Disasters • Storms, hurricanes, earthquakes, volcanoes… • Man Made • Terrorist/wars/civil unrest • Theft/vandalism • Fire/explosion/building collapse • Power outages
ID Critical Functions Resources • Specific types of technology • Necessary software • Electrical power • Network/physical production environment • Safe environment for workers • Access to outside entities • Communication lines
Likelihood Assessment • Business Impact Assessment (BIA) identifies the likelihood that each risk will occur • Expressed in terms of an annualized rate of occurrence (ARO) that reflects the number of times a business expects to experience a given disaster each year
Impact Assessment • Exposure Factor (EF) is the amount of damage that the risk poses to the asset • Single loss expectancy (SLE) is the $ loss that is expected each time the risk materializes • Annualized loss expectancy (ALE) is the $ loss that is expected to occurs as a result of the risk over the period of a year
Example • Fire at Building • Building value of $500,000 • Exposure factor of 70% • Occurs once every 30 years • What is the ALE?
Qualitative Assessment • Loss of confidence and goodwill among your clients • Loss of employees due to down time • Social/ethical responsibilities to the community • Negative publicity
Resource Prioritization • Create a list of all of the risks you analyzed during the BIA process and sort them in descending order by the ALE • Results of the quantitative or qualitative analysis may justify a risk as having a higher priority based on business impact
Continuity Strategy • Focuses on the development and implementation of a continuity strategy to minimize the impact realized risks might have on protected assets • Consider the MTD and decide which risks are acceptable • Bridge the gap between BIA and Continuity
Provisions and Processes • People • Ensure that people within your organization are safe before, during, and after an emergency • Building/facilities • Infrastructure
Buildings/facilities • Hardening provisions • Reinforce structure, patch roofs, etc • Alternate sites • Hot Site • Ready for data processing in a few hours of less • Contains all necessary systems, devices • Just needs people & data • Annual tests are conducted • Most expensive subscription option
More Sites • Warm Site • Ready for data processing in 12 hours or longer • Some peripheral devices • Needs software, people, data, and computers • Better choice for proprietary hardware/software • Less expensive than hot sites
More Sites • Cold Site • Empty building • No equipment • Electrical wiring, A/C, plumbing, and flooring • Two weeks or longer for operational status • Least expensive
Testing Offsite Facility • Hardware should be compatible • Software should be compatible • Type of database transfer • Remote mirroring/database shadowing • Remote journaling • Electronic vaulting • Test data backups • Full, incremental, differential
BCP Plan Approval • Gain top level management endorsement • Be prepared with explanations of purpose • Planning team should contain top level executive • Helps to get final approval
Testing and Drills • Test Characteristics • Indicate if company can actually recover • At least annually • Identify areas of weakness • Drills • Create a disaster scenario • Create goals to be accomplished • Run drill and report findings to management
BCP Tests • Checklist tests • Copies of BCP distributed to functional manager • Review part of plan that addresses their area • Simplest but most crucial • Structured walk through • Functional managers meet to go through plan • Simulation • Carry out the disaster scenario • Continues up to actual relocation to offsite • Response measures are tested
BCP Tests • Parallel • Some systems are transported to the offsite facility for parallel processing • Actually relocate personnel where they perform their disaster recovery tasks • Full interruption test • Original site shuts down • All processing takes place at offsite
What is Success? • Response within an acceptable timeframe • Operations at alternate location adequate • Backups successfully restored • Emergency personnel reached within acceptable time frame • Team members aware of current plan and able to perform associated duties • Plan is current and relevant
BCP Plan can Become Outdated • Technology changes • Company merges or splits • Plan in not properly maintained • Personnel turnover • No person or group made responsible • Plan not audited • No change control tool
BCP Phases • Business Impact Analysis • Strategy Development • Plan Development • Implementation • Testing • Maintenance
Are We There Yet? • 2005 Survey indicates: • Less than 15% of companies prepared for disaster • 40% of companies would be out of business permanently if closed for a week
Legislative Issues • Health Insurance Portability and Accountability Act (HIPPA) • Gramm – Leach – Briley Act (GLB) • Patriot Act • Electronic Communications Privacy Act (ECPA)