170 likes | 336 Views
(Title) – Concept Design Review (CDR). Update logo from: /View/Master/Slide Master. Date of Review First Use Acknowledgements Image of diagnostic. Establish Key Contacts. (name) PI (name) PA. LLE Will Complete after the review. Update Date from: /View/Master/Slide Master.
E N D
(Title) – Concept Design Review (CDR) Update logo from: /View/Master/Slide Master Date of Review First Use Acknowledgements Image of diagnostic Establish Key Contacts (name) PI (name) PA LLE Will Complete after the review Update Date from: /View/Master/Slide Master Enter number of pages – required for PDM submittal 5/17/10
Overview - Motivation -Summarize Scope-Summarize Motivation Campaign Details:EP or Omega Or Joint Shot?;Campaign Type? Side Lighter/ Back Lighter?What TIM’s or Fixed? 5/17/10
Requirements List RequirementsMechanical - PositioningPerformanceAccuracy 5/17/10
Target Diagnostic Check List (Diagnostics Only) – Disclose Equipment Requirements Double Click and Edit; Items marked “Y” should show up on a slide in the presentation 5/17/10
Design Concepts Approaches Issues Options Trade offs Target Diagnostic Check List Items 5/17/10
P &ID – Tutorial Located on LLE Web Site 240 psi 240 psi 240 psi pump 5/17/10
Bias “T” Details To Scope To 15V Cabling/Connection Overview N-Type 15Vdc Power TDS-694 Cu Foil LaCave Omega Laser Pulse PhotoDiode 527 nm P510 Green Fiducial 5/17/10
Space Claim – Floor Plan Temporary Scopes and PS’s 5/17/10
Viewing/Editing SRA – 1) Click on your project from the project status summary to get to the LLE Project Milestones page 3)Edit page, then Select Save & Print 4)This button allows the SRA to be viewed/printed/saved – Save the SRA 5)Take a screen shot of the SRA and place in presentation 2) Select SRA 5/17/10
SRA 5/17/10
FMEA – Each Entry on SRA requires an Entry on FMEA; additional entries can be made Enter the Line #’s into the SRA Form (Associated Risk) There must be a change in one of these two columns (Before vs After) Double Click & Edit 5/17/10
Viewing EQC 1) Click on your project from the project status summary to get to the LLE Project Milestones page 3) Select “Save & Print Landscape”; Take a screen shot of each page and put in presentation (two slides) 2) Select EQC 5/17/10
EQC 5/17/10
EQC 5/17/10
Issues - Risks 5/17/10
Resources – Who does What - Assignments 5/17/10
Budget (LLE Reviews Only) 5/17/10